CERC · Central Electricity Regulatory Commission

Renewable Energy Sources Tariff Regulations, 2012 — Fourth Amendment, 2015

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fourth Amendment) Regulations, 2015

Amendment · Gazette copyDated 7 Oct 2015Published in the Gazette 23 Oct 2015No. L-1/94/CERC/2011- dated 7th October, 2015

Replaced by RE Tariff Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the RE Tariff Regulations, 2012 — Fourth Amendment, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Fourth Amendment to its 2012 renewable energy tariff regulations, published in the Gazette of India (Extraordinary) on 23 October 2015 (p1), with a notification date of 7 October 2015 (p6). Its single purpose is to bring municipal solid waste (MSW) and refuse derived fuel (RDF) based power projects into the RE tariff framework, by way of new definitions, eligibility criteria and a dedicated technology-specific chapter.

Clauses 2–3 insert definitions of 'Municipal solid waste' and 'Refuse Derived Fuel' into Regulation 2 of the Principal Regulations; clause 4 adds these technologies to the list of tariff periods (p6). Clauses 5–7 extend the applicability and eligibility provisions of Regulations 3 and 4 to MSW and RDF projects, requiring new plant and machinery based on Rankine cycle technology using MSW or RDF as fuel (pp6–7). Clauses 8–10 deal with Regulation 6 tariff periods — carving MSW/RDF out of the general RE period and giving them their own — and allow an option of project-specific tariff guided by the new Chapter 5A (p7). Clause 11 designates MSW/RDF projects as MUST RUN and free of merit order despatch; clause 12 places them under the grid code and UI regulations for scheduling and despatch; clause 13 extends the Regulation 17 working capital computation to them (p8).

Clause 14 inserts Chapter 5A (pp8–10), specifying the technology scope (Rankine cycle combustion or incineration, bio-methanation, pyrolysis, high-end gasifier), normative capital cost for FY 2015-16 with annual review for the balance control period, threshold PLF for stabilisation and later years, auxiliary consumption, station heat rate, O&M expenses and escalation, calorific value, and RDF fuel price with escalation at the developer's option; no fuel cost is allowed for MSW projects. Clauses 15–18 amend Forms 2.1 and 2.2 so that MSW and RDF appear as fuel types and variable-charge components (pp10–11). A closing Note lists the gazette publication dates of the Principal Regulations and the first three amendments (p11).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Other copies of these documents (4)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.