CERC · Central Electricity Regulatory Commission
Renewable Energy Sources Tariff Regulations, 2012 — Fourth Amendment, 2015
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fourth Amendment) Regulations, 2015
Amendment · Gazette copyDated 7 Oct 2015Published in the Gazette 23 Oct 2015No. L-1/94/CERC/2011- dated 7th October, 2015
Replaced by RE Tariff Regulations, 2017
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the RE Tariff Regulations, 2012 — Fourth Amendment, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission's Fourth Amendment to its 2012 renewable energy tariff regulations, published in the Gazette of India (Extraordinary) on 23 October 2015 (p1), with a notification date of 7 October 2015 (p6). Its single purpose is to bring municipal solid waste (MSW) and refuse derived fuel (RDF) based power projects into the RE tariff framework, by way of new definitions, eligibility criteria and a dedicated technology-specific chapter.
Clauses 2–3 insert definitions of 'Municipal solid waste' and 'Refuse Derived Fuel' into Regulation 2 of the Principal Regulations; clause 4 adds these technologies to the list of tariff periods (p6). Clauses 5–7 extend the applicability and eligibility provisions of Regulations 3 and 4 to MSW and RDF projects, requiring new plant and machinery based on Rankine cycle technology using MSW or RDF as fuel (pp6–7). Clauses 8–10 deal with Regulation 6 tariff periods — carving MSW/RDF out of the general RE period and giving them their own — and allow an option of project-specific tariff guided by the new Chapter 5A (p7). Clause 11 designates MSW/RDF projects as MUST RUN and free of merit order despatch; clause 12 places them under the grid code and UI regulations for scheduling and despatch; clause 13 extends the Regulation 17 working capital computation to them (p8).
Clause 14 inserts Chapter 5A (pp8–10), specifying the technology scope (Rankine cycle combustion or incineration, bio-methanation, pyrolysis, high-end gasifier), normative capital cost for FY 2015-16 with annual review for the balance control period, threshold PLF for stabilisation and later years, auxiliary consumption, station heat rate, O&M expenses and escalation, calorific value, and RDF fuel price with escalation at the developer's option; no fuel cost is allowed for MSW projects. Clauses 15–18 amend Forms 2.1 and 2.2 so that MSW and RDF appear as fuel types and variable-charge components (pp10–11). A closing Note lists the gazette publication dates of the Principal Regulations and the first three amendments (p11).
Read with this
The regulation
Amendments and corrections
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources (First Amendment) Regulations, 2014
- Dated 5 Jan 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 10 Jul 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Third Amendment) Regulations, 2015
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment, 2016
Commencement notices and reasons
- Dated 6 Feb 2012RE Tariff Regulations, 2012 — Statement of Objects and Reasons
- Dated 18 Mar 2014RE Tariff Regulations, 2012 — First Amendment, 2014 — Statement of Reasons
- Dated 5 Jan 2015RE Tariff Determination (Second Amendment) Regulations, 2014 — Statement of Reasons
- Dated 10 Jul 2015RE Tariff Third Amendment Regulations, 2015 — Statement of Reasons
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015 — Statement of Reasons
- Dated 30 Mar 2016RE Tariff Regulations, 2012 — Fifth Amendment, 2016 — Statement of Reasons
Other copies of these documents (4)
- Dated 6 Feb 2012RE Tariff Regulations, 2012
- Dated 5 Jan 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources, 2012 — First Amendment Regulations, 2014
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment Regulations, 2016
Proposed changes (drafts with no final yet)
- Dated 3 Mar 2015Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 under RE Tariff Regulations, 2012 — Draft
- Dated 3 Mar 2015File: Benchmark Capital Cost Norm for Solar PV and Solar Thermal Projects, FY 2015-16 — Suo-Motu Order — Draft
- Dated 3 Mar 2015Public notice: Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 — Public Notice
Earlier drafts
- Dated 6 Dec 2013RE Tariff (First Amendment) Regulations, 2013 — Draft
- Dated 6 Dec 2013Public notice: Renewable Energy Sources Tariff (First Amendment) Regulations, 2013 — Draft
- Released with the notice dated 6 Dec 2013Explanatory memorandum: RE Tariff Regulations, 2012 — First Amendment, 2013 — Explanatory Memorandum
- Dated 25 Nov 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014 — Draft
- Dated 25 Nov 2014Public notice: RE Tariff Determination (Second Amendment) Regulations, 2014 — Public Notice
- Released with the notice dated 25 Nov 2014Explanatory memorandum: RE Tariff (Second Amendment) Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources (Third Amendment) Regulations, 2015 — Draft
- Released with the notice dated 16 Apr 2015Explanatory memorandum: Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2014 — Third Amendment — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Public notice: Draft RE Tariff Determination (Third Amendment) Regulations, 2015 — Public Notice
- Released with the notice dated 10 Aug 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fourth Amendment, 2015 — MSW and RDF
- Released with the notice dated 10 Aug 2015Explanatory memorandum: MSW/Waste to Energy Generic Tariff Norms, 2015-16 — Explanatory Memorandum
- Dated 10 Aug 2015Public notice: Public Notice — Proposed Generic Tariff Norms for Municipal Solid Waste/Waste to Energy Projects and Indicative Tariff for 2015-16
- Dated 16 Mar 2016Renewable Energy Tariff Determination (Fifth Amendment) Regulations, 2016 — Draft
- Dated 16 Mar 2016Public notice: Renewable Energy Sources Tariff Regulations, 2012 — Fifth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 16 Mar 2016Explanatory memorandum: Renewable Energy Sources Tariff, 2012 — Fifth Amendment, 2016 — Explanatory Memorandum — Draft
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.