Renewable Energy Sources Tariff, 2012 — Fifth Amendment, 2016 — Explanatory Memorandum — Draft

Explanatory Memorandum for CERC Draft (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fifth amendment) Regulations, 2016

Explanatory memorandum to a draftReleased with the notice dated 16 Mar 2016

Explanatory memorandum to the Renewable Energy Tariff Determination (Fifth Amendment) Regulations, 2016 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum accompanying the draft Fifth Amendment to the Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012. It exists to justify a change to a single parameter: the normative operation and maintenance (O&M) expense allowed for solar PV in the last year of the control period, FY 2016-17 (p1–2).

Paragraphs 1–4 recall the Principal Regulations, in force from 6.2.2012, and the existing Regulation 59 O&M provision for solar PV — a first-year norm escalated annually — together with the activities it is meant to cover: module cleaning and washing, inverter and balance-of-system checks, string-level monitoring, troubleshooting and repair, and manpower (p1).

Paragraph 5 contrasts that approach with the 2011 Explanatory Memorandum to the original RE regulations, which framed solar PV O&M as a band expressed as a percentage of capital cost (p1). Paragraph 6 and the table on p2 carry the Commission's core justification: capital cost per MW fell steeply across 2012-13 to 2015-16 while normative O&M rose both in absolute terms and as a share of capital cost. Paragraphs 7–8 add external benchmarks — a TNERC consultative paper proposing solar PV O&M as a percentage of capital cost with escalation, and industry reports that contract O&M is now available at much lower rates than the normative level (p2).

Paragraphs 9–10 conclude that the FY 2016-17 norm should be rationalised and propose a proviso to Regulation 59(1) setting that year's normative O&M at Rs. 7 lakhs per MW (p2). No date of issue, comment deadline or notification number is stated.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Operating costs and other income

Read with this

Other copies of these documents (5)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document