RE Tariff (First Amendment) Regulations, 2013 — Draft

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (First Amendment) Regulations, 2013

Draft amendmentDated 6 Dec 2013L-1/94/CERC/2011 dated 6.12.2013

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a three-page draft notification in which CERC proposes the first amendment to its 2012 renewable energy tariff regulations. It is issued under s.61 read with s.178(2)(s) of the Electricity Act 2003, is marked 'NOTIFICATION (DRAFT)', and would come into force only from the date of publication in the Official Gazette, which is not printed (p1).

The proposed changes are confined to biomass power projects based on the Rankine cycle. Clause 2 substitutes Regulation 34 to set normative capital cost, differentiated by condenser type (water-cooled or air-cooled) and by whether the project is rice-straw based, for FY 2013-14, with that cost linked to the indexation formula in Regulation 35 (p1). Clause 3 replaces Regulation 37's auxiliary power consumption norms, again distinguishing water-cooled from air-cooled condensers (p2). Clause 4 replaces Regulation 38's station heat rate, differentiated by boiler type — travelling grate or AFBC (p2). Clause 5 replaces Regulation 39, fixing normative O&M expense for the second year of the Control period (stated to be FY 2013-14) with annual escalation (p2). Clause 6 substitutes Regulation 41 to prohibit the use of fossil fuel outright (p2). Clause 7 substitutes Regulation 43, fixing a single calorific value of biomass fuel for tariff determination (p3). Clause 8 adds an alternative to Regulation 44: biomass fuel price may instead be decided annually by a State-level committee constituted by the appropriate Regulatory Commission, with Nodal Agency, State Government and distribution licensee representation (p3).

An end note records the publication particulars of the Principal Regulations (p3).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Other copies of these documents (5)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.