Search the library
Filters
Document typeclear
Regulation2471Notification705Statement of reasons365Gazette342Order311Code143Report84Procedure75Topicclear
Distribution866General / Administrative742Renewable Energy713Tariff & Pricing689Grid Operations531Open Access362Licensing & Compliance248Transmission230Year
15 documents, newest first. 1 earlier draft and its notices are left out because their final regulation is in the library. Show them.
Procedure of verification of status of CGP, 2024
Short Term Open Access in Inter-State Transmission through NOAR — Procedure, 2022
Captive Generating Plant Status Verification Procedure, Himachal Pradesh
Processing of Open Access Applications — Practice Directions under the 2016 Open Access Regulations
Distribution and Transmission Open Access Practice Directions, 2016
Connectivity, LTA and MTOA Detailed Procedure, 2009 — Amendment, 2015 (online submission of applications)
Start-up Power Drawal Procedure for New Generating Stations, 2014
Procedure for Making Application for Grant of Connectivity in ISTS, 2009
Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
Short Term Green Energy Open Access (ST-GEOA) Implementation Procedure
Detailed Procedure for Open Access in Transmission and Distribution System
Procedure for Grant of Connectivity to the Distribution System, 33 kV and below — under Grid Connectivity and Intra State Open Access Regulations, 2014
Procedure for Grant of Connectivity to the Intra-State Transmission System
Captive Generating Plant Status Verification Procedure under the Electricity Rules, 2005 — Draft
DraftConnectivity and GNA Formats, 2017
Draft