Skip to content

CERC · Central Electricity Regulatory Commission

Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022

Procedure for Short Term Open Access in inter-State Transmission System through National Open Access Registry (NOAR)

ProcedureDate not stated

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Open Access in inter-State Transmission Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the operating procedure that makes the National Open Access Registry (NOAR) the single electronic gateway for short term open access (STOA) in the inter-State transmission system. It is issued under Regulation 4 of the CERC (Open Access in inter-State Transmission) Regulations, 2008 and the Fifth Amendment Regulations, 2018, and is dated April 2022 (p1–2).

Section 1 describes NOAR as a common platform and sets out what it must do: give all stakeholders one interface, automate STOA administration, hold STOA data for CERC's Market Monitoring Cell, exchange data with RLDC/SLDC scheduling and STOA software, interface with power exchanges for validation of standing clearance, keep audit trails and dashboards, host e-bidding for congestion management, run a payment gateway and disbursement, and generate MIS (p2–3).

Section 2 makes the platform mandatory: every application under Regulation 6 of the Principal Regulations, including standing clearance for bilateral and collective transactions, is made and approved through NOAR, as are the documents the regulations require (p3). Section 3 defines Host RLDC, Host SLDC, short term customer and standing clearance (p3). Section 4 allocates duties — NLDC is the nodal agency for implementing and operating NOAR and handles TTC/RM/ATC, cyber security, disaster recovery, registration of traders and power exchanges and ISTS charges; host RLDCs register regional entities and process bilateral applications; SLDCs register and grant standing clearance for intra-State entities and keep state charges updated (p3–5).

Sections 5 and 6 are the operative core: registration (Format-A application, fee, e-verification, disposal timelines by entity type, three-year validity and renewal) and standing clearance (application flow, SLDC scrutiny windows, deemed grant if not disposed of in time, refusal with reasons, withdrawal or revision for grid security, use of state clearance for power-exchange and OTC transactions, display of debarred customers) (p5–8).

Section 7 governs scheduling against standing clearance with NOAR-side checks on aggregate quantum (p8). Sections 8 and 9 route cross-border STOA and ISTS charges and losses through NOAR by reference to the 2019 Cross Border Trade Regulations and the 2020 Sharing Regulations (p8). Section 10 covers payment terms, operating charges, persistent defaulters and disbursement (p8–9). Section 11 provides for MIS; Section 12 covers costs borne by customers, display of registered entities and credential confidentiality (p9). Format-A on p10 is the online registration form.

Standard name
Open Access Regulations
Primary topics
Open access, Scheduling and despatch, Open access charges

Read with this

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document