Procedure for Making Application for Grant of Connectivity in ISTS, 2009

PROCEDURE FOR MAKING APPLICATION FOR GRANT OF CONNECTIVITY IN ISTS

ProcedureDated 31 Dec 2009In force from 1 Jan 2010No.–L-1/(3)/2009-CERC dated 31st December, 2009

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 53 of 133. Check the regulator's original before you rely on it.

This is a CERC order dated 31 December 2009 (p1) approving the Central Transmission Utility’s detailed procedure for applications for connectivity to the inter-State transmission system. The order recites Regulation 27(1) of the CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009, which required CTU to submit a detailed procedure after public consultation (p1–2). CTU submitted its draft on 9 November 2009 with stakeholder comments (p2). CERC approves the procedure titled “Procedure for making application for grant of connectivity in ISTS” as the Annexure and directs CTU to give it wide publicity (p2). It also directs that the 2009 Regulations come into force w.e.f. 1 January 2010 and that CTU operationalise the procedure from the same date (p2–3).

The annexed procedure at pp4–10 is the operational core. Section 1 sets scope: applications for connectivity received by CTU on or after the notified commencement; eligible applicants are generating stations, including captive plants, of 250 MW and above and bulk consumers seeking at least 100 MW from ISTS; CTU/POWERGRID is the nodal agency; a connection agreement or tripartite agreement is required before physical interconnection (p4–5). Section 2 lists project-preparedness information generators must file—land, environmental clearance, forest clearance, fuel and water linkage—supported by an affidavit in FORMAT-CON-1 (p5–6). Section 3 prescribes submission by sealed envelope, the application format CON-2, and a non-refundable fee slab tied to quantum of power (p6–7). Section 4 governs changes: material location changes or capacity changes above 100 MW require a fresh application with fee forfeiture and possible cancellation; minor changes use a revised CON-2 (p7). Section 5 sets CTU processing, interconnection study under the CEA Technical Standards for Connectivity to the Grid Regulations, 2007, a 60-day intimation in CON-3, additional data in CON-4 and connection details in CON-5 before signing CON-6 (p7–8). Section 6 provides that connectivity alone does not allow power interchange; long-term access, medium-term open access or short-term open access is separately required, with a commissioning/infirm-power exception subject to RLDC permission (p8–9). Section 7 covers dedicated transmission systems, exemptions for large thermal and hydro stations, cost deposits and bank guarantees (p9–10). Section 8 covers indemnity, applicant-borne costs, compliance with the Electricity Act and CERC regulations, review by the nodal agency with prior CERC approval, and complaints to CERC (p10).

Formats and annexures at pp11–53 include the affidavit, application, grant intimation, additional connection information with schedules and IEEE/PSS/E excitation data annexures, connection offer letter, draft connection agreement, bank guarantee proforma, and a transmission agreement with POWERGRID for dedicated systems.

Standard name
Open Access Regulations
Primary topics
Connectivity and GNA, Open access, Transmission tariff

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.