CERC · Central Electricity Regulatory Commission
Start-up Power Drawal Procedure for New Generating Stations, 2014
Procedure for drawal of Start-up Power for new Generating Stations, 2014
ProcedureDated 12 Aug 2014No. L-1/(93)/2009-CERC dated 12th August, 2014
Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Deviation Settlement Mechanism and related matters Regulations, 2014.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC Secretary's letter of 12 August 2014 to the CEO of POSOCO recording that the Commission has approved the "Procedure for drawal of startup power for new generating stations, 2014" as an Annexure, and asking POSOCO to give it wide publicity (p1). The document therefore has two layers: the one-page approval letter and the operative Procedure and its formats.
The Procedure (p2–6) creates a route for a generating station still in its commissioning phase to draw start-up power from the Inter-State Transmission System through the Deviation Settlement Mechanism instead of contracting for it. It applies only where no unit of the station is already in commercial operation; if a unit is commissioned, the later units should normally take start-up power from it, unless that unit's output is fully allocated or committed under MTOA/LTA (p2). It states a scope binding on RLDCs, RPCs and generating stations including ISGS in the Seller category, and defines construction power, start-up power and auxiliary power to keep construction drawal out of this route (p2–3).
It then sets the pre-conditions a station must satisfy before applying — CTU connectivity, a signed Connection Agreement, established ISTS connectivity, commissioned switchyard equipment, data and voice communication with the RLDC, RPC-specified protection and GT/ST tap coordination (p3). It prescribes what the station must submit and undertake when applying (p3–5), the periodic data it must keep updating while drawing (p5), and the RLDC's role in granting, staggering, limiting or stopping drawal and in directing relays (p5–6). The maximum period for drawal is capped at 21 months from commencement of drawal — fifteen months before expected synchronisation and six months after — with any extension to be sought from CERC two months in advance (p6).
The remaining pages are blank formats: the application form (p7), the undertaking to be signed (p8–9) and the RLDC's grant of start-up power (p10). No commencement date, validity clause or repeal is stated; the text says only that the Commission has approved the Procedure.
Read with this
The regulation
Amendments and corrections
- Dated 17 Feb 2014Corrigendum to the Deviation Charges Notification, 6 January 2014
- Dated 18 Dec 2014Deviation Settlement Mechanism and related matters (First Amendment) Regulations, 2014
- Dated 7 Aug 2015Deviation Settlement Mechanism and related matters (Second Amendment) Regulations, 2015
- Dated 6 May 2016Deviation Settlement Mechanism and related matters Regulations, 2014 — Third Amendment, 2016
- Dated 20 Nov 2018Deviation Settlement Mechanism and related matters (Fourth Amendment) Regulations, 2018
- Dated 28 May 2019Deviation Settlement Mechanism and related matters Regulations, 2014 — Fifth Amendment, 2019
- Dated 12 Jun 2019Deviation Settlement Mechanism and Related Matters (Fifth Amendment) Regulations, 2019 — Errata
- Dated 5 Sep 2019Deviation Settlement Mechanism and Related Matters (Fourth Amendment) Regulations, 2018 — Erratum, 2019
Commencement notices and reasons
- Dated 5 Jan 2015Deviation Settlement Mechanism (First Amendment) Regulations, 2014 — Statement of Reasons
- Dated 6 May 2016Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2016 — Statement of Reasons
- Dated 20 Nov 2018Deviation Settlement Mechanism and Related Matters (Fourth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 12 Jun 2019Deviation Settlement Mechanism and Related Matters Regulations — Fifth Amendment, 2019 — Statement of Reasons
- Date not statedForecasting, Scheduling and Imbalance Handling for Wind and Solar, 2015 — Statement of Reasons
Procedures and orders made under it
- Dated 27 Mar 2020Deviation Settlement Mechanism (Fifth Amendment) Regulations, 2019 — Removal of Difficulties Order, 2020
- Date not statedProcedure for Implementation of the Framework on Forecasting, Scheduling and Imbalance Handling for Wind and Solar RE Generating Stations including Power Parks at Inter-State Level
Other copies of these documents (6)
- Dated 6 Jan 2014Deviation Settlement Mechanism and Related Matters Regulations, 2014
- Dated 18 Dec 2014Deviation Settlement Mechanism (First Amendment) Regulations, 2014
- Dated 7 Aug 2015Deviation Settlement Mechanism and related matters (Second Amendment) Regulations, 2015
- Dated 6 May 2016Deviation Settlement Mechanism and related matters, 2014 — Third Amendment, 2016
- Dated 20 Nov 2018Deviation Settlement Mechanism and related matters (Fourth Amendment) Regulations, 2018
- Dated 28 May 2019Deviation Settlement Mechanism and related matters (Fifth Amendment) Regulations, 2019
Earlier drafts
- Dated 20 Jun 2013Deviation Settlement Mechanism and related matters Regulations, 2013 — Draft
- Released with the notice dated 20 Jun 2013Explanatory memorandum: Explanatory Memorandum to Draft Deviation Settlement Mechanism Regulations, 2013
- Dated 20 Jun 2013Public notice: Draft Deviation Settlement Mechanism and related matters Regulations, 2013 — Public Notice
- Dated 24 Jun 2014Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2014 — Draft
- Released with the notice dated 23 Jun 2014Explanatory memorandum: Deviation Settlement Mechanism (First Amendment) Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 23 Jun 2014Public notice: Deviation Settlement Mechanism (First Amendment) Regulations, 2014 — Public Notice — Draft
- Released with the notice dated 31 Mar 2015Deviation Settlement Mechanism and related matters (Second Amendment) Regulations, 2015 — Draft
- Dated 23 Oct 2015Deviation Settlement Mechanism and Related Matters, Third Amendment Regulations, 2015 — Draft
- Dated 23 Oct 2015Public notice: Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2015 — Draft Public Notice
- Released with the notice dated 23 Oct 2015Explanatory memorandum: Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2015 — Explanatory Memorandum — Draft
- Dated 29 Jun 2018Deviation Settlement Mechanism and related matters, 2014 — Fourth Amendment, 2018 — Draft
- Dated 29 Jun 2018Public notice: Draft Deviation Settlement Mechanism and related matters (Fourth Amendment) Regulations, 2018 — Public Notice
- Released with the notice dated 29 Jun 2018Explanatory memorandum: Deviation Settlement Mechanism and related matters Regulations, 2014 — Fourth Amendment, 2018 — Explanatory Memorandum
- Dated 18 Apr 2019Deviation Settlement Mechanism and related matters, 2014 — Fifth Amendment Regulations, 2019 — Draft
- Released with the notice dated 18 Apr 2019Explanatory memorandum: Explanatory Memorandum — Draft DSM (Fifth Amendment) Regulations, 2019
- Dated 18 Apr 2019Public notice: Draft Deviation Settlement Mechanism (Fifth Amendment) Regulations, 2019 — Public Notice
- Dated 3 May 2019Hearing notice: Public notice for public hearing on draft Deviation Settlement Mechanism (Fifth Amendment) Regulations, 2019
2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.