MERC · Maharashtra Electricity Regulatory Commission
Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Draft
Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019
Draft regulationReleased with the notice dated 26 Oct 2019
Draft
A proposal that has since been finalised as the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the draft of the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 — the framework that would replace the Commission's 2015 rooftop solar net metering regulations, extending to the whole of Maharashtra and taking effect from publication in the Official Gazette (p1).
Definitions and scope come first (p1–5, Regs 1–2): net metering, net billing, banked energy, the Eligible Consumer, metering and settlement vocabulary. Part A (p5–6, Regs 3–5) sets general conditions — both arrangements granted non-discriminatorily on a first-come-first-served basis at transformer/feeder level, net metering reserved for residential consumers, and a cumulative ceiling on renewable capacity per distribution transformer with a proviso requiring the licensee to exceed it absent an adverse load study, plus quarterly publication of available headroom.
Part B (p6–11, Regs 6–10) is the technical block: who may be an Eligible Consumer and at what individual capacity, interconnection standards and safety, anti-islanding, synchronisation and harmonic requirements, metering infrastructure (net meter, renewable energy generation meter, check meters), the web-based application and approval procedure with its timelines, and the connection agreement.
Part C (p12–16, Regs 11–15) handles money: net metering energy accounting for residential consumers with a first tranche netted at retail tariff, banking of surplus and purchase of the balance at generic tariff; net billing as a bundled purchase by the licensee at generic tariff, expressed as a billing equation; meter-failure accounting; RPO treatment; REC ineligibility; and exemption from wheeling, banking, cross-subsidy and transmission charges.
Part D (p16–17, Regs 16–20) gives the Commission powers to relax, issue orders and practice directions, amend and remove difficulties, and repeals the 2015 net metering regulations with savings for systems already commissioned. Annexures 1–6 (p18–31) supply the application procedure, model application form and checklist, model net metering and net billing connection agreements, the behind-the-meter prior-intimation form, and the transformer-capacity reporting format.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
- Released with the explanatory memorandum dated 22 Sep 2026Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2026 — Draft
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
- Released with the notice dated 26 Oct 2019Explanatory memorandum: Explanatory Memorandum on Draft Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019
7 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 1 copy in another language and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.