MERC · Maharashtra Electricity Regulatory Commission
Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2026 — Draft
Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2026
Draft regulationReleased with the explanatory memorandum dated 22 Sep 2026No. MERC / Tech /Regulation/2026 /____ dated __ September 2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a draft MERC regulation that would replace the 2019 grid-interactive rooftop framework and consolidate net metering, net billing, group net metering, gross metering, virtual net metering and behind-the-meter systems in Maharashtra (p1, p6, p29). It extends to the whole State and is to commence on publication in the Official Gazette, with transitional rules for applications made after the draft and for capacity augmentation (p1).
Part A, Regulations 3–5, sets the scope and general conditions: the arrangements covered, capacity limited by contract demand or sanctioned load, non-discriminatory first-come-first-serve connectivity, an energy-storage obligation for larger new systems, limits on switching between arrangements, treatment of consumers with arrears, priority for open-access settlement, and a distribution-transformer capacity cap that can be exceeded after a load study (pp6–9).
Part B, Regulations 6–10, covers technical arrangements: eligible-consumer and project capacity, interconnection to CEA standards, islanding and harmonic requirements, inverter data sharing, metering infrastructure and check meters, the online application and registration-fee process with service timelines, and a 20-year connection agreement supported by model forms (pp9–15).
Part C, Regulations 11–14, is the commercial core. It prescribes bill disclosures and energy accounting for net metering, group net metering, virtual net metering, net billing and gross metering; a banking framework keyed to Contracted RE Capacity, with a small-consumer annual banking window and slot-based monthly banking with fixed and variable charges above it (pp16–27); accounting for meter defects; and allocation of RPO credit (pp27–28).
Part D, Regulations 15–19, gives the Commission powers to relax, issue directions, amend and remove difficulties, and repeals the 2019 Regulations and their 2023 and 2024 amendments with savings for existing agreements and migration options (pp29–30). The annexures provide application forms, model connection agreements, a prior-intimation form, a transformer-capacity reporting format and a VNM application form (pp31–54).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 26 Oct 2019Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Draft
- Released with the notice dated 26 Oct 2019Explanatory memorandum: Explanatory Memorandum on Draft Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
7 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 1 copy in another language and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.