MERC · Maharashtra Electricity Regulatory Commission
Explanatory Memorandum on Draft Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019
EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (GRID INTERACTIVE ROOFTOP RENEWABLE ENERGY GENERATING SYSTEMS) REGULATIONS, 2019
Explanatory memorandum to a draftReleased with the notice dated 26 Oct 2019
Draft
The draft has since been finalised as the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019.
Explanatory memorandum to the Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is MERC's October 2019 explanatory memorandum to its draft Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019. It is not the draft itself: it explains why the Commission proposes to recast the 2015 net-metering framework and discusses only clauses where a change is proposed (p1, p4).
Chapter 1 sets out the background: the Commission's RE tariff and RPO regulations, the national rooftop solar target, the 2015 net-metering regulations and their 2017 amendment, and implementation experience (p3–4). It identifies limitations of a self-consumption-only framework, DISCOM revenue concerns, grid-stability issues and the Forum of Regulators' 2019 model regulations as reasons for revisiting the framework (p3–4).
Chapter 2 covers general principles. It explains the proposed change of name and scope to cover net metering, net billing and RE systems behind the consumer meter (p5, p8). It walks through added or modified definitions — banked energy, check meter, eligible consumer, generic tariff, net billing, net meter and RE generation meter (p5–8). It then explains the proposed split: net metering retained for residential consumers, net billing for other categories (p9–11), and a distribution-transformer-level capacity rule requiring a minimum share for RE and allowing higher capacity unless a load study shows adverse impact (p11–12).
Chapter 3 addresses technical arrangements: minimum system size, capacity linked to sanctioned load or contract demand, a bar on consumers with arrears, interconnection and safety requirements, metering and check meters, the web-based application and registration process, approval validity, and the model connection agreements (p13–20).
Chapter 4 covers commercial arrangements. It explains residential net-metering settlement with a capped netting band and purchase of surplus at generic tariff (p21–24); net billing, where the DISCOM buys all generation under a PPA at generic tariff and bills consumption under a formula (p25–28); treatment of meter defects (p28–29); RPO treatment, with all net-billing generation counting toward the DISCOM's RPO (p29); and the bar on REC issuance for net-metered or net-billed generation (p29).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
- Released with the explanatory memorandum dated 22 Sep 2026Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2026 — Draft
Earlier drafts
- Released with the notice dated 26 Oct 2019Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Draft
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
7 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 1 copy in another language and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.