CERC · Central Electricity Regulatory Commission

Inter-State Connectivity, Long-term Access and Medium-term Open Access Regulations, 2009 — Amendment, 2010

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Amendment) Regulations, 2010

AmendmentDated 3 Sep 2010No-L-1/(3)/2009-CERC dated 3rd September, 2010

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a three-paragraph CERC amendment regulation issued on 3 September 2010 that rewrites three specific pieces of the 2009 connectivity and open-access framework for inter-State transmission (p1). It stands on the Commission's general regulation-making power under section 178 of the Electricity Act, 2003, and takes effect only from the date it is published in the Official Gazette — that Gazette date is not printed anywhere in the text (p1).

Paragraph 1 gives the short title and the commencement rule. Paragraph 2 substitutes the definition of "Applicant" in Regulation 2 of the principal regulations, restating who may apply for connectivity: large generating stations and captive plants above a capacity threshold, hydro and renewable stations in a lower capacity band, a nominated "lead generator" acting for a group of small hydro/renewable stations that individually fall below the threshold but together reach it, and bulk consumers (p1–2). Paragraph 3(a) replaces Regulation 8(1) on the contents of a connectivity application and adds provisos: a fresh application is required if the location changes or the quantum of power interchanged moves beyond stated margins; and a lead generator's application is entertained only if all co-located generators sign a written agreement making it responsible for grid-code and commercial obligations, copied to CTU and the RLDC (p2–3). Paragraph 3(b) amends the proviso to Regulation 8(8), exempting large thermal and hydro/renewable stations (other than captive plants) from building a dedicated transmission line to the connection point and requiring them to be covered in CTU/CEA coordinated transmission planning (p3). A closing note records when the principal regulations were published (p3).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Network planning and investment

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.