Connectivity, LTA and MTOA in inter-State Transmission Regulations, 2009 — Second Amendment, 2012

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters)( Second Amendment) Regulations, 2012

AmendmentDated 21 Mar 2012No.–L-1/(3)/2009-CERC dated 21st March, 2012

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Second Amendment to the 2009 regulations governing grant of connectivity, long-term access (LTA) and medium-term open access (MTOA) in inter-State transmission. It is a short, five-clause amending instrument dated 21 March 2012 (p1) and takes effect from the date of publication in the Official Gazette — a date not printed in this text (p1).

Clause 2 substitutes Regulation 8(7) of the principal regulations, restating the regime under which a generating unit, including a captive generating plant, may inject infirm power during testing and full-load testing before COD — subject to prior permission of the concerned RLDC, a time limit running from first synchronization, a Commission-granted extension on advance application, grid-security provisos, an onus on the generator to prove testing purpose, and treatment of the injected power as Unscheduled Interchange paid per the CERC UI Regulations, 2009 (p1–3). It also adds two provisos to Regulation 8(8) on phased construction of dedicated transmission lines, tying phases to capacity likely to be commissioned and to advance payments on main plant or EPC packages, and making transmission charges payable even if the project is delayed or abandoned (p3).

Clause 3 rewrites the third proviso to Regulation 12(1) on phased construction of the transmission system on a similar basis, and inserts a proviso requiring a generator that has firmed up beneficiaries through signing long-term PPAs to notify the nodal agency with a copy of the PPA (p3–4). Clause 4 adds a new Regulation 15A obliging an LTA customer to intimate termination of its PPA to the nodal agency within two weeks, empowering CTU/transmission licensee to seek surrender of LTA where access is mutually terminated or unused for over a year and another project would be stranded, and preserving liability for transmission charges under Regulation 18; the nodal agency may then consider MTOA applications on the freed corridor (p4–6). Clause 5 adds Regulation 16A, routing freed capacity to RLDC/SLDC for processing short-term open access requests under the 2008 Open Access regulations until LTA or MTOA is granted to another applicant (p6–7). A closing Note records the gazette details of the principal regulations and the first amendment (p7).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Open access, Power procurement and PPAs

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.