Inter-State Connectivity, LTA and MTOA Regulations, 2009 — Sixth Amendment, 2017

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Sixth Amendment) Regulations, 2017

AmendmentDated 17 Feb 2017No.–L-1/(3)/2009-CERC dated 17th February 2017

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Sixth Amendment to CERC's 2009 regulations governing grant of connectivity, long-term access (LTA) and medium-term open access (MTOA) to the inter-State transmission system. It is a short, clause-by-clause amending instrument issued by the Commission under section 178 of the Electricity Act, 2003, and it takes effect from the date of Gazette publication (the Gazette date itself is not printed; the notification is dated 17 February 2017) (p1).

Regulation 1 gives the short title and commencement (p1). Regulation 2 rewrites two definitions in Regulation 2(1) of the Principal Regulations — the duration bands that distinguish "long-term Access" from "Medium-Term Open Access" — thereby resetting who falls into each access category (p1). Regulation 3 replaces Regulation 8(8), specifying who must develop, own and operate a dedicated transmission line from a generating station to the pooling station of the transmission licensee, empowering CTU to indicate line specifications, capping the length of such lines for larger thermal, hydro and renewable stations, and allocating transmission charges where such a line has been built by CTU under coordinated planning — first to the generating company, then into the POC pool after LTA is operationalised (p2). Regulation 4 adds qualifying words to Regulation 9(2) on the transmission system under execution that may be considered for connectivity (p2).

New Regulation 15B sets out the procedure for firming up drawl or injection by an LTA customer: notifying the nodal agency of a power purchase agreement, the conditions attached to scheduling, the CTU/RLDC timeline, and the consequences for existing MTOA/STOA capacity, including a relinquishment-charge relief (p2–3). New Regulation 16B in turn deals with underutilisation of LTA/MTOA — RLDC notice, the customer's duty to explain, release of unutilised transfer capability to medium- and short-term transactions with a recall condition, and relief from LTA charges on reallocated capacity (p3–4).

The next clause substitutes Regulation 19(2), resetting the permissible start-date window for MTOA relative to the application date (p4). Regulation 7 inserts two new provisions after Regulation 33 — a power to relax the regulations to remove hardship, and a power to remove difficulty in giving effect to them — both exercisable by the Commission on its own motion or on application (p4). A closing Note lists the Gazette publication details of the Principal Regulations and each of the five earlier amendments, making this document also a convenient reference for the instrument's amendment chain (p4–5).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Open access, Connectivity and GNA, Transmission tariff

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document