Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 — Fourth Amendment, 2014

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Fourth Amendment) Regulations, 2014

AmendmentDated 12 Aug 2014No. L-1/(93)/2009-CERC dated 12th of August 2014

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-clause CERC amendment regulation that rewrites Regulation 8(7) of the 2009 connectivity, long-term access and medium-term open access regulations. It was issued on 12 August 2014 (p1) and comes into force from publication in the Official Gazette; the Gazette date is not printed (p1).

The substituted clause covers a single subject: interchange of power between the grid and a generating unit — including a captive generating plant — that has connectivity to the inter-State Transmission System and is still in its commissioning period, i.e. testing and full-load testing before commercial operation. It replaces the earlier sub-clause with a self-contained regime, overriding both clause (6) of the same regulation and any Power Purchase Agreement provision on sale of infirm power (p1).

Under it, the unit may draw start-up power and inject infirm power only with the prior permission of the concerned Regional Load Despatch Centre, and only within outer time limits keyed to the date of first synchronization — 15 months before the expected date of first synchronization and 6 months after it for start-up power drawal, and 6 months from first synchronization for infirm power injection (p1–2). Start-up power attracts transmission charges and must be backed by a revolving irrevocable letter of credit from a scheduled bank equal to 2 months' transmission charges; it may not be used for construction, and the RLDC must stop the drawal if it is, or if the generator defaults on monthly transmission charges at the transmission licensee's request (p2).

The clause also lets the Commission extend the interchange period in exceptional circumstances on an application made at least two months in advance, requires the RLDC to keep grid security in view, places the onus of proving the power is for commissioning on the generating company, and treats interchanged infirm power as deviation settled under the CERC Deviation Settlement Mechanism Regulations, 2014 (p2–3).

The closing Note records the Principal Regulations' publication and the three earlier amendments (p3).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Deviation settlement (DSM), Payment security

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document