Treatment of LoA-based Connectivity under GNA Regulations, 2026 — Order

Mechanism for treatment of connectivity granted under the GNA Regulations based on the LoA where the PPA has not been signed within a period of 12 months from the date of issuance of the LoA

OrderDated 10 Jul 2026Petition No. 11/SM/2026 dated 10.07.2026

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 34 of 51. Check the regulator's original before you rely on it.

This is CERC's suo motu order in Petition No. 11/SM/2026 dated 10.07.2026 on what to do with inter-State transmission connectivity granted on the strength of a Renewable Energy Implementing Agency's Letter of Award (LoA) where no PPA was ever signed (p1). It records that a large block of connectivity is blocked by legacy LoAs, and that MoP's committee letter of 30.9.2025 and later OM of 16.04.2026 pressed for a window to surrender such connectivity without forfeiting bank guarantees and for auctioning the freed capacity (p1-2, p5). After a staff paper (25.11.2025), a draft order (06.5.2026) and a public hearing (23.5.2026), the Commission uses its power to relax under Regulation 41 and its suo motu power under Regulation 44 to offer a set of options as a one-time measure; unlike the draft, the mechanism is optional (p2, p5, p8-9).

The operative mechanism is Annexure-I (pp10-23). Paragraphs 1 to 3 define who is covered — entities holding in-principle or final connectivity on the LoA route, including those transitioned from the 2009 Connectivity Regulations or converted from the Land/Land BG routes, with LoAs issued between 1.1.2019 and 31.05.2025 by SECI, NTPC, NHPC and SJVN and no PPA signed — and set the data flow: REIAs list such LoAs to CTUIL, CTUIL publishes a draft then a final list on its website, and entities get 60 days from that final list to choose (p10-11). An REIA No Objection Certificate is the gateway document to Options I, II and III (p11).

Clause 6 specifies four options. Option-I lets an entity exit the LoA route while keeping connectivity, on a fresh SCOD, with land and financial-closure milestones and a performance bank guarantee; Option-II substitutes the LoA with a PPA signed under another LoA, including group/parent-company arrangements, part-quantum conversion and multi-located projects; Option-III is surrender of part or full connectivity with return of the connection BGs; Option-IV is to stay under the GNA Regulations, which is also the deemed outcome if no option is chosen (p11-18). Clause 7 then deals with the freed-up capacity: reallocation to entities at the same substation cluster at a base price, and failing that an open auction run by CTUIL with bidder fee, EMD and PBG, with proceeds applied to reduce monthly transmission charges of drawee DICs (p19-23).

Annexure-II (pp26-34) records stakeholder comments and the Commission's decisions: requests to widen scope, relax milestones or return the PBG are largely rejected, while the option window is lengthened and the PBG rate reduced (p26-34). Appendices I and II list the stakeholders who commented and appeared; Appendices A and B are the data formats for REIAs and CTUIL (p5, p10).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Power procurement and PPAs, Transmission tariff

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document