Connectivity and GNA Regulations, 2022 — First Amendment, 2023 — Statement of Reasons

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023

Statement of reasonsDated 31 Jul 2024L-1/261/2021/CERC dated 31.07.2024

The commission's reasons for the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 30 of 45. Check the regulator's original before you rely on it.

This is the Commission's Statement of Reasons (dated 31.07.2024) for the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023 — the amendment to the GNA Regulations, 2022 (notified 7 June 2022, effective 5 April 2023 except a few provisions from 1 October 2023). It records stakeholder comments on the draft amendment notified 27.01.2023, the public hearing held 13.03.2023 (attendees at Appendices I–II, pp1–2), and the Commission's clause-by-clause reasoning and final decisions (pp1–2).

Sections 2–4 deal with the eligibility-to-connect architecture: a new definition of "Host State" (p2); allowing additional generation capacity or storage to be added within an already-granted connectivity quantum with CTU approval and a Lead Generator/Lead ESS responsibility, answered against comments on PPAs, separate connectivity and fees (pp2–5); and a reworked document regime for connectivity applications by renewable power park developers and by RE generating stations/ESS — LOA/PPA route versus land route, the new Land Bank Guarantee alternative, removal of the auditor's 10% equity certificate at application stage, and conversion between the two routes via Regulation 11A (pp5–14). Section 5 settles the ATS/'augmentation' wording in Regulations 7.1–7.2 (pp14–15).

Sections 6–8 set milestone and security discipline: a new Regulation 9.3 requiring financial closure within defined periods tied to the start date of connectivity, with proof to CTU and revocation on failure (pp15–19); permit to use a bulk consumer's GNA by its subsidiaries at the same ISTS connection point under Regulation 15.1 (pp19–21); and return of Conn-BG1/2/3 for Regulation 17.1(iii) entities via a new Regulation 16.5, read with transition provisions (p21).

Sections 9–12 cover access designations and treatment of intra-State-connected entities: a new Regulation 17.1(vi) injecting entity (pp21–22); deemed GNA for LTA-holding generators connected to the intra-State system (Regulation 18.1(f), pp22–23); reduction of a host State's Annexure-I GNA quantum by an Annexure-II methodology (Regulation 18.3, pp23–24); and the introduction of GNARE and T-GNARE for drawal only from renewable sources, with conversion to GNA, eligibility questions and interaction with the Sharing Regulations' RE waiver (Regulations 20.4 and 26.4, pp24–28).

Sections 13–15 close with security and revocation: Conn-BG1 and Conn-BG3 for Regulation 17.1(iii) entities and no Conn-BGs for Regulation 17.1(ii) entities (Regulation 22.2, p28); extension of GNA-sharing by another entity from one year to three years (Regulation 23.1, pp28–29); and a new Regulation 24.6 setting out the grounds and last dates for revocation of connectivity for failure to achieve COD, with the Conn-BG consequences (pp29–30 onward).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Energy storage deployment, Transmission tariff

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.