Procedure for Levying Compensation Charges for Additional Time to Achieve Milestones under the GNA Regulations, 2022

Procedure for levying compensation charges for permitting additional time to achieve milestones under the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022.

OrderDated 14 Aug 2026Petition No. 5/SM/2026 dated 14.08.2026

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 29 of 34. Check the regulator's original before you rely on it.

CERC's suo motu order in Petition No. 5/SM/2026 (dated 14.08.2026) creates a uniform, optional procedure for connectivity grantees who have missed GNA milestone deadlines to buy extra time by paying Milestone Extension Charges (MEC). The order records that land-document, financial-closure and COD failures ordinarily lead to revocation under GNA Regulations 11A, 11B and 24.6, and that many developers have sought extensions. It invokes Regulation 41 (power to relax) and Regulation 44 (suo motu orders) to relax those provisions and adopts the procedure at Annexure-I (pp1-5). It applies from the date of issuance to all eligible entities, not only new applications (p13).

Annexure-I (pp6-11) sets out the mechanics. Eligibility depends on land documents: generally at least 20% of required land for land or financial-closure extensions, and higher thresholds, 75% for the Land/Land-BG route and 50% for the LOA/PPA route, to seek extra time for COD. Documents must be filed 15 working days before the deadline, with CTUIL scrutinising and allowing a short deficiency-rectification window. MEC is levied per MW per day, separately for each milestone, with month-wise escalation and maximum extensions (three months for land, six for financial closure, twelve for COD). Payment is normally 15 days in advance; unutilised amounts are refunded without interest or may be adjusted against another milestone. Failure triggers revocation and bank-guarantee treatment. A two-month post-GNA-effectiveness grace period is carved out with no MEC, within the twelve-month COD cap. The order also directs 50% of land/FC MEC and 100% of COD MEC to reduce monthly transmission charges under the Sharing Regulations, 2020, and preserves the firm start date and PPA terms.

Annexure-II (pp12-29) records stakeholder comments and CERC's reasons: it rejects reason-based waivers, keeps MEC payable irrespective of fault, declines linkage to PPAs or BG values, reduces land eligibility for COD to 75%, and rejects requests to extend timelines further or differentiate by project size or captive consumers. Appendices I-II list commenters and public-hearing participants (p4).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Transmission tariff

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document