Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC’s Explanatory Memorandum for the draft Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2022, issued as no. L-1/265/2022/CERC dated 9.10.2022 (p1). It is not the draft regulation itself: it explains why CERC proposes to overhaul the 2010 Grid Code and summarises the proposed codes, definitions and regulatory text extracts.
The Background (pp1–10) traces the evolution of the Indian grid into one synchronous national grid, the growth of renewables and cross-border interconnections, and CERC’s earlier measures on reserves, AGC, DSM, RTM, SCED and the 50 Hz frequency agenda. It records the Expert Group chaired by Shri Rakesh Nath and its January 2020 report, the 50 Hz Committee recommendations, and the 2022 Ancillary Services, DSM and GNA Regulations that the draft Grid Code is meant to align with (pp10–11). It then lists the salient features of the proposed codes (pp11–13).
The Definitions chapter (pp13–18) explains proposed new or revised terms: system states, ancillary services, ACE, AGC, declared capacity variants, control centres, energy storage, AGC control modes, flow-gate, frequency-response terms, gate closure, generating unit, GNA terms, grid-forming capability, infirm power, merit order, minimum turndown level, primary/secondary/tertiary reserves, pooling station, QCA, ramp rate, SCED, SCUC, SNA, system constraint and user.
The Resource Planning Code (pp18–26) proposes a bottom-up resource-adequacy framework: distribution licensees forecast demand and plan generation procurement; STUs aggregate state demand; NLDC runs a national simulation; CTU and STUs assess transmission adequacy; FOR may develop model guidelines. The Connection Code (pp26–30) covers compliance with applicable regulations, grant of connectivity under GNA, first-time energization procedures, connectivity agreements with transmission licensees, joint system studies, and data/communication facilities.
The Protection Code (pp30–36) proposes a common protection philosophy, RPC-level relay-setting database, annual self-audit and five-yearly third-party audit, protection performance indices, system protection schemes and recording-instrument standards. The Commissioning and Commercial Operation Code (pp36–54) covers start-up power and infirm injection, trial-run notices and tests, part commissioning for RE, trial runs for thermal, hydro, RE, ESS, hybrid, transmission and communication elements, test reports before COD, certificates, declarations and COD conditions.
The Operating Code (pp54–111) is the largest part. It proposes system states, frequency control and reserves, operational planning, outage planning, system restoration, real-time operation, demand and load management, post-despatch analysis, periodic reports, reactive-power management, and field testing for model validation. The Scheduling and Despatch Code (pp111–148) deals with control-area jurisdiction, LDC responsibilities, scheduling prerequisites under GNA/T-GNA, ACE, declared capacity, ramping, hydro scheduling, QCA-based RE scheduling, minimum turndown level, cross-border scheduling, SCUC, SCED, curtailment, schedule revision and GD-5 disturbance settlement. The Cyber Security Code (pp148–150) aligns with the CEA Cyber Security in Power Sector Guidelines, 2021 and requires audit and incident reporting. The Monitoring and Compliance Code (pp150–151) proposes self-audit and third-party compliance audit, with reporting to RLDC/SLDC, the Commission or the SERC depending on the entity.
Read with this
The regulation
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
Amendments and corrections
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Commencement notices and reasons
- Dated 3 Aug 2023Gazette – effective date 1.10.2023
- Dated 3 Aug 2023Notification – effective date 1.10.2023
- Dated 2 Aug 2024Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 28 Sep 2023Detailed Procedure for Assessment of Secondary & Tertiary Reserve Capacity — Approval Order, 28 September 2023
- Dated 30 Sep 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)
- Dated 18 Dec 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (Second Order)
- Dated 16 Apr 2024Detailed Procedure for SCUC, USD and SCED at Regional Level, 2024 — Approval Order under Indian Electricity Grid Code Regulations, 2023
- Dated 22 Dec 2024Indian Electricity Grid Code Regulations, 2023 — Third Removal of Difficulties Order, 2024
- Dated 12 Feb 2025Black Start Support Payment Procedure
- Dated 12 Mar 2025Detailed Procedure for MTL Support through SCED for Section 62 Generators, IEGC Regulations 2023 — Approval Order, 2025
Other copies of these documents (2)
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Proposed changes (drafts with no final yet)
- Dated 21 Sep 2026Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft
- Dated 21 Sep 2026Explanatory memorandum: Draft IEGC Second Amendment Regulations, 2026 — Explanatory Memorandum
- Dated 21 Sep 2026Public notice: Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Public Notice
- Dated 22 Oct 2026Notice extending the date for comments: Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Extension of last date for comments — Public Notice
- Dated 22 Oct 2026Hearing notice: Public hearing notice on Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 7 Jun 2022Indian Electricity Grid Code Regulations, 2022 — Draft
- Dated 7 Jun 2022Public notice: Draft Indian Electricity Grid Code Regulations, 2022 — Public Notice
- Dated 30 Aug 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 30.09.2022
- Dated 29 Sep 2022Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 29 Sep 2022Hearing notice: Public hearing on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 18 Oct 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 31.10.2022 — Public Notice
- Dated 12 Jun 2024Indian Electricity Grid Code Regulations, 2023 — First Amendment, 2024 — Draft
- Released with the notice dated 12 Jun 2024Explanatory memorandum: Indian Electricity Grid Code, 2023 — First Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 12 Jun 2024Public notice: Indian Electricity Grid Code (First Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 31 Jul 2024Hearing notice: Public hearing notice — Draft Indian Electricity Grid Code (First Amendment) Regulations, 2024
6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.