Draft Indian Electricity Grid Code Regulations, 2022 — Explanatory Memorandum

Draft Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2022

Explanatory memorandum to a draftDated 9 Oct 2022L-1/265/2022/CERC dated 9.10.2022

Draft

The draft has since been finalised as the Indian Electricity Grid Code Regulations, 2023.

Explanatory memorandum to the Indian Electricity Grid Code Regulations, 2022 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC’s Explanatory Memorandum for the draft Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2022, issued as no. L-1/265/2022/CERC dated 9.10.2022 (p1). It is not the draft regulation itself: it explains why CERC proposes to overhaul the 2010 Grid Code and summarises the proposed codes, definitions and regulatory text extracts.

The Background (pp1–10) traces the evolution of the Indian grid into one synchronous national grid, the growth of renewables and cross-border interconnections, and CERC’s earlier measures on reserves, AGC, DSM, RTM, SCED and the 50 Hz frequency agenda. It records the Expert Group chaired by Shri Rakesh Nath and its January 2020 report, the 50 Hz Committee recommendations, and the 2022 Ancillary Services, DSM and GNA Regulations that the draft Grid Code is meant to align with (pp10–11). It then lists the salient features of the proposed codes (pp11–13).

The Definitions chapter (pp13–18) explains proposed new or revised terms: system states, ancillary services, ACE, AGC, declared capacity variants, control centres, energy storage, AGC control modes, flow-gate, frequency-response terms, gate closure, generating unit, GNA terms, grid-forming capability, infirm power, merit order, minimum turndown level, primary/secondary/tertiary reserves, pooling station, QCA, ramp rate, SCED, SCUC, SNA, system constraint and user.

The Resource Planning Code (pp18–26) proposes a bottom-up resource-adequacy framework: distribution licensees forecast demand and plan generation procurement; STUs aggregate state demand; NLDC runs a national simulation; CTU and STUs assess transmission adequacy; FOR may develop model guidelines. The Connection Code (pp26–30) covers compliance with applicable regulations, grant of connectivity under GNA, first-time energization procedures, connectivity agreements with transmission licensees, joint system studies, and data/communication facilities.

The Protection Code (pp30–36) proposes a common protection philosophy, RPC-level relay-setting database, annual self-audit and five-yearly third-party audit, protection performance indices, system protection schemes and recording-instrument standards. The Commissioning and Commercial Operation Code (pp36–54) covers start-up power and infirm injection, trial-run notices and tests, part commissioning for RE, trial runs for thermal, hydro, RE, ESS, hybrid, transmission and communication elements, test reports before COD, certificates, declarations and COD conditions.

The Operating Code (pp54–111) is the largest part. It proposes system states, frequency control and reserves, operational planning, outage planning, system restoration, real-time operation, demand and load management, post-despatch analysis, periodic reports, reactive-power management, and field testing for model validation. The Scheduling and Despatch Code (pp111–148) deals with control-area jurisdiction, LDC responsibilities, scheduling prerequisites under GNA/T-GNA, ACE, declared capacity, ramping, hydro scheduling, QCA-based RE scheduling, minimum turndown level, cross-border scheduling, SCUC, SCED, curtailment, schedule revision and GD-5 disturbance settlement. The Cyber Security Code (pp148–150) aligns with the CEA Cyber Security in Power Sector Guidelines, 2021 and requires audit and incident reporting. The Monitoring and Compliance Code (pp150–151) proposes self-audit and third-party compliance audit, with reporting to RLDC/SLDC, the Commission or the SERC depending on the entity.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Ancillary services and reserves

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.