Skip to content

CERC · Central Electricity Regulatory Commission

Black Start Support Payment Procedure

Procedure for payment for Black Start Support

ProcedureDated 12 Feb 2025No. L-1/265/2022/CERC dated 12.02.2025

Made under the Indian Electricity Grid Code Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's order dated 12.02.2025 approves the "Detailed Procedure for payment for Black Start Support" that NLDC submitted on 25.07.2024 after stakeholder consultation (p1). The order records that the Grid Code was published on 11.07.2023 and made effective from 01.10.2023, and that Regulation 34(9) requires NLDC to prepare a payment procedure for black start support and submit it for approval (p1). The Commission approved the procedure with changes; it is effective from the date of issue of the order (p1).

The annexed Procedure (p2) sets out the framework. Its Preamble ties it to Regulation 34(9) and Chapter 6 of the Grid Code, says terms take Grid Code meanings, requires RLDCs to inform stakeholders of grid disturbances under Regulation 37.2, and provides that payment comes from the regional Deviation and Ancillary Service Pool Account (p3). The Objective is to lay down payment to any inter-state or intra-state entity that injects power to help recover the system from a partial or total blackout (p3). The Scope covers all categories of grid disturbance under Regulation 37.2(f) Table 8, identified black start entities under Regulation 34(6), and other entities with scheduling and ABT metering under the CEA Metering Regulations, 2006; intra-state entities are eligible only for regional grid disturbances, not for disturbances within their own state, and SLDCs may develop their own intra-state procedure (p3–4).

Section 4 specifies how payment works: RLDCs advise identified entities to provide support; the RLDC certifies the time blocks from injection until recovery from restorative to alert/normal state; payment is at 110 % of the normal deviation charge for the last block in which the grid was available, under the DSM Regulations; payment is made by RLDCs from the regional pool; no schedule is given to beneficiaries for that generation; RLDCs send consolidated details to RPCs in format_AA, RPCs publish payment statements in format_BB with the deviation statement, and RLDCs pay within 10 days and reconcile within two months of quarter end (p4). Formats AA and BB are at pp5–6.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Energy accounting and settlement

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document