CERC · Central Electricity Regulatory Commission
Detailed Procedure for MTL Support through SCED for Section 62 Generators, IEGC Regulations 2023 — Approval Order, 2025
Approval of "Detailed procedure for moderating schedule up to minimum turndown level for Section 62 generators through SCED" under Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023.
ProcedureDated 12 Mar 2025In force from 24 Mar 2025No. L-1/265/2022/CERC dated 12th March 2025
Made under the Indian Electricity Grid Code Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
CERC's order dated 12 March 2025 approves NLDC's Detailed Procedure for moderating schedules up to the minimum turndown level (MTL) for Section 62 thermal generating stations through Security Constrained Economic Despatch (SCED) under the Indian Electricity Grid Code Regulations, 2023 (p1–2). The order recites the Principal IEGC Regulations notification and effective date, the First Amendment notification and effective date, and NLDC's submission of the procedure after stakeholder consultation; the Commission approves it with suitable changes and makes it effective from 24 March 2025 (p1–2).
The annexed procedure (pp3–9) first defines D/D-1/D+1 and MTL and sets applicability: thermal regional entity stations whose tariff is determined under Section 62 and which seek MTL support through SCED must participate in both SCED-Up and SCED-Down; stations already selected under SCUC, two-shift stations during off-bar blocks, and specified gas-based stations are excluded (p3–4). It assigns RLDCs to declare peak/off-peak hours and coordinate with NLDC, and requires eligible stations to review schedules at 14:30 D-1, report a below-MTL off-peak schedule that is above MTL for at least eight peak blocks by 15:30 D-1, file Format-A1 by 20:00 D-1 and Format-A2 by 06:00 D+1 (p4). NLDC prepares and publishes the list of likely MTL-support stations, may exclude stations for anticipated congestion, prioritises SCED-Down in exporting regions and SCED-Up in importing regions, publishes the next-day list by 20:30 D-1, and can bar a station from MTL support after repeated failure to submit the required formats (p5–6).
The SCED section says identified stations may be scheduled up to MTL, with equivalent SCED-Down dispatched in merit order, limited by available down reserves and technical limits; SCED runs after RTM and is not segregated upfront, only post facto for accounting (p6). Accounting and settlement provisions keep beneficiary schedules unchanged, route MTL SCED-Up payments through the National Pool Account (SCED), match SCED-Up and SCED-Down, and allocate any net cost to beneficiaries whose requisition shortfall caused the below-MTL schedule; NLDC issues a monthly National SCED Statement for MTL support, payable within a fixed period with simple interest for delay (pp7–9). Interest earned in the pool is shared between SCED generators and beneficiaries after liabilities (p9). The annexure contains Format-A1 and Format-A2 undertakings and Format-SCED_MTL tables for monthly SCED-Up/Down bifurcation, shortfall and beneficiary cost apportionment (pp10–13).
Read with this
The regulation
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
Amendments and corrections
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Commencement notices and reasons
- Dated 3 Aug 2023Gazette – effective date 1.10.2023
- Dated 3 Aug 2023Notification – effective date 1.10.2023
- Dated 2 Aug 2024Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 28 Sep 2023Detailed Procedure for Assessment of Secondary & Tertiary Reserve Capacity — Approval Order, 28 September 2023
- Dated 30 Sep 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)
- Dated 18 Dec 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (Second Order)
- Dated 16 Apr 2024Detailed Procedure for SCUC, USD and SCED at Regional Level, 2024 — Approval Order under Indian Electricity Grid Code Regulations, 2023
- Dated 22 Dec 2024Indian Electricity Grid Code Regulations, 2023 — Third Removal of Difficulties Order, 2024
- Dated 12 Feb 2025Black Start Support Payment Procedure
Other copies of these documents (2)
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Proposed changes (drafts with no final yet)
- Dated 21 Sep 2026Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft
- Dated 21 Sep 2026Explanatory memorandum: Draft IEGC Second Amendment Regulations, 2026 — Explanatory Memorandum
- Dated 21 Sep 2026Public notice: Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Public Notice
- Dated 22 Oct 2026Notice extending the date for comments: Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Extension of last date for comments — Public Notice
- Dated 22 Oct 2026Hearing notice: Public hearing notice on Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 7 Jun 2022Indian Electricity Grid Code Regulations, 2022 — Draft
- Dated 7 Jun 2022Public notice: Draft Indian Electricity Grid Code Regulations, 2022 — Public Notice
- Dated 30 Aug 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 30.09.2022
- Dated 29 Sep 2022Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 29 Sep 2022Hearing notice: Public hearing on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 9 Oct 2022Explanatory memorandum: Draft Indian Electricity Grid Code Regulations, 2022 — Explanatory Memorandum
- Dated 18 Oct 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 31.10.2022 — Public Notice
- Dated 12 Jun 2024Indian Electricity Grid Code Regulations, 2023 — First Amendment, 2024 — Draft
- Released with the notice dated 12 Jun 2024Explanatory memorandum: Indian Electricity Grid Code, 2023 — First Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 12 Jun 2024Public notice: Indian Electricity Grid Code (First Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 31 Jul 2024Hearing notice: Public hearing notice — Draft Indian Electricity Grid Code (First Amendment) Regulations, 2024
6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.