CERC · Central Electricity Regulatory Commission

Detailed Procedure for MTL Support through SCED for Section 62 Generators, IEGC Regulations 2023 — Approval Order, 2025

Approval of "Detailed procedure for moderating schedule up to minimum turndown level for Section 62 generators through SCED" under Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023.

ProcedureDated 12 Mar 2025In force from 24 Mar 2025No. L-1/265/2022/CERC dated 12th March 2025

Made under the Indian Electricity Grid Code Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's order dated 12 March 2025 approves NLDC's Detailed Procedure for moderating schedules up to the minimum turndown level (MTL) for Section 62 thermal generating stations through Security Constrained Economic Despatch (SCED) under the Indian Electricity Grid Code Regulations, 2023 (p1–2). The order recites the Principal IEGC Regulations notification and effective date, the First Amendment notification and effective date, and NLDC's submission of the procedure after stakeholder consultation; the Commission approves it with suitable changes and makes it effective from 24 March 2025 (p1–2).

The annexed procedure (pp3–9) first defines D/D-1/D+1 and MTL and sets applicability: thermal regional entity stations whose tariff is determined under Section 62 and which seek MTL support through SCED must participate in both SCED-Up and SCED-Down; stations already selected under SCUC, two-shift stations during off-bar blocks, and specified gas-based stations are excluded (p3–4). It assigns RLDCs to declare peak/off-peak hours and coordinate with NLDC, and requires eligible stations to review schedules at 14:30 D-1, report a below-MTL off-peak schedule that is above MTL for at least eight peak blocks by 15:30 D-1, file Format-A1 by 20:00 D-1 and Format-A2 by 06:00 D+1 (p4). NLDC prepares and publishes the list of likely MTL-support stations, may exclude stations for anticipated congestion, prioritises SCED-Down in exporting regions and SCED-Up in importing regions, publishes the next-day list by 20:30 D-1, and can bar a station from MTL support after repeated failure to submit the required formats (p5–6).

The SCED section says identified stations may be scheduled up to MTL, with equivalent SCED-Down dispatched in merit order, limited by available down reserves and technical limits; SCED runs after RTM and is not segregated upfront, only post facto for accounting (p6). Accounting and settlement provisions keep beneficiary schedules unchanged, route MTL SCED-Up payments through the National Pool Account (SCED), match SCED-Up and SCED-Down, and allocate any net cost to beneficiaries whose requisition shortfall caused the below-MTL schedule; NLDC issues a monthly National SCED Statement for MTL support, payable within a fixed period with simple interest for delay (pp7–9). Interest earned in the pool is shared between SCED generators and beneficiaries after liabilities (p9). The annexure contains Format-A1 and Format-A2 undertakings and Format-SCED_MTL tables for monthly SCED-Up/Down bifurcation, shortfall and beneficiary cost apportionment (pp10–13).

Standard name
Grid Code
Primary topics
Scheduling and despatch, Energy accounting and settlement, Grid operation and grid code

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.