Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code (First Amendment) Regulations, 2024

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2024

Amendment · Gazette copyDated 23 Oct 2024Published in the Gazette 29 Oct 2024No. L-1/265/2022/CERC. dated 23rd October 2024

The Gazette copy of the Indian Electricity Grid Code (First Amendment) Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2024 — an amendment to the IEGC Regulations, 2023 (p5, p8). The notification is dated 23 October 2024 and was published in the Gazette of India (Extraordinary) on 29 October 2024 (p1, p5). The gazette carries a Hindi version and an English version.

Regulation 1 gives the short title and commencement: everything takes effect from Gazette publication except the amendment to Regulation 45(12), which is given effect from 1 April 2024, i.e. retrospectively (p5).

The operative changes sit in Regulations 2–6 (pp5–8). Regulation 2 rewrites the infirm-power injection windows so that renewable energy generating stations and energy storage systems are treated differently from other stations, and inserts a route to extend the period — short extensions by the RLDC, longer ones by the Commission, on advance application (p5). Regulation 3 changes the trial-run test to four cumulative hours in a single day and adds a conditional route to declare COD for hydro and pumped-storage stations where reservoir levels prevent full design-capability demonstration, with de-rating as the fallback (pp5–6). Regulation 4 ties the start of scheduling to the declared COD at D+2 (p6). Regulation 5 substitutes the part-load compensation provisos, separating stations whose tariffs are adopted under Section 63 from those determined under Section 62 (p6). Regulation 6 makes the largest set of changes to Regulation 49: beneficiary consent for schedule changes, a new SCED-based adjustment mechanism for schedules falling below minimum turndown level with differences settled between stations, pro-rata limits on beneficiary downward revisions after 1430 hrs on D-1 (with a worked illustration, p7), and new caps on Declared Capacity and schedule revisions, available only for bilateral transactions (pp6–8). NLDC must submit a detailed payment procedure within a month of the notification (p7).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Energy accounting and settlement

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document