Skip to content

CERC · Central Electricity Regulatory Commission

Detailed Procedure for Assessment of Secondary & Tertiary Reserve Capacity — Approval Order, 28 September 2023

Approval of "Detailed Procedure for Assessment of Quantum of Secondary & Tertiary Reserve Capacity, along with Information Exchange and Timelines" under Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023

ProcedureDated 28 Sep 2023No. L-1/265/2022/CERC dated 28th September, 2023

Made under the Indian Electricity Grid Code Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's approval order, dated 28 September 2023, for NLDC's "Detailed Procedure for Assessment of Quantum of Secondary & Tertiary Reserve Capacity, along with Information Exchange and Timelines", submitted by NLDC on 20.09.2023 after stakeholder consultation (p1–2). The procedure exists because Regulation 30(11)(k) of the Indian Electricity Grid Code Regulations, 2023 requires NLDC to prepare a methodology for assessing secondary reserve capacity, and Regulations 30(11)(a), 30(11)(q) and 30(12)(d) require NLDC to assess tertiary reserve requirements and fix information-exchange modalities and timelines (p1–2). The Commission approved the procedure with changes and enclosed it as the Annexure; NLDC must give detailed feedback within one month after six months of the procedure's effective date (p2).

The Procedure itself (pp3–12) sets out its objective, scope over all Grid Code entities, roles of NLDC as Nodal Agency with RLDCs and SLDCs, and the definition of reference contingency, defined as the maximum instantaneous positive power deviation between generation and demand used to size reserves (p3–4). It distinguishes primary, secondary and tertiary reserves by activation time and duration (p5), and specifies the Area Control Error formula and its sign convention (p5–6). Sections 8 and 9 give the estimation methodology at year-ahead, three-day-ahead, day-ahead and real-time horizons, including diversity scaling, apportionment between inter-state and intra-state reserves, and derivation of the quantum to be bought in the day-ahead and real-time TRAS markets (pp6–11). Section 10 fixes information-dissemination deadlines, and Section 11 provides for amendment with CERC approval (pp11–12).

The annexures are the operational core: Formats RAS1–RAS6 for data submission and reserve declaration (pp13–23), Annexure I on uniform ACE calculation, frequency and tie-line measurement, frequency bias and metering-error offset (pp24–32), the FRC template (p33) and Format RAS7 for frequency bias values (p34).

Standard name
Grid Code
Primary topics
Ancillary services and reserves, Grid operation and grid code, Power markets and exchanges

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document