Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code (First Amendment) Regulations, 2024

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2024

AmendmentDated 23 Oct 2024No. L-1/265/2022/CERC dated 23.10.2024

Amends the Indian Electricity Grid Code Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to the CERC (Indian Electricity Grid Code) Regulations, 2023, issued as a notification dated 23.10.2024 (p1). It is a short, operative instrument — six numbered amendment clauses — that re-tunes a set of grid-code provisions on infirm power, commercial operation, scheduling, part-load compensation and SCED/minimum turndown level. It comes into force on Gazette publication, except the change to Clause (12) of Regulation 45, which the text backdates to 1.04.2024 (p1).

The amendment rewrites Regulation 19 on infirm power: separate injection windows are created for generating stations generally and for REGS and ESS (excluding Hydro PSP ESS), with a proviso letting RLDCs grant limited extensions and the Commission grant longer ones on application (p1–2). Regulation 22 is loosened in two ways — the auxiliary-consumption demonstration window changes from continuous to cumulative hours in a day, and hydro stations may declare COD without full rated water-drawing levels, subject to later demonstration or de-rating effective from COD (p2–3). Regulation 27 shifts scheduling start to a defined D+2 convention (p3).

Regulation 45's third and fourth provisos are replaced to route part-load compensation for thermal stations either through the adopted contract (s.63 stations) or the applicable Tariff Regulations (s.62 stations) (p3). The largest block is Regulation 49 (p3–7): consent requirements for beneficiaries, a new sub-clause (v-a) adjusting schedules below minimum turndown level through SCED with a payment/adjustment mechanism for charges, permissions for buyers' downward revisions after 1430 hrs on D-1 with a worked illustration table (p6), and a new Clause (7-a) capping declared-capacity revisions by plant type (p6–7). A closing note records the Gazette publication of the Principal Regulations on 11.07.2023 (p7).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Energy storage deployment

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document