Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (Second Order)

Removal of difficulties (Second Order) in giving effect to certain provisions of Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023.

OrderDated 18 Dec 2023Petition No. 18 /SM/2023 dated 18.12.2023

Made under the Indian Electricity Grid Code Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's second removal-of-difficulties order under the CERC (Indian Electricity Grid Code) Regulations, 2023. The Grid Code was gazetted on 11.07.2023 and brought into effect from 01.10.2023; a first removal-of-difficulties order followed on 30.09.2023. Here the Commission disposes of Suo Motu Petition 18/SM/2023, taken up on representations from Grid-India, NLC, NTPC, NEEPCO, NTPL and the Government of Himachal Pradesh (p1–2).

The order works through four issues. On minimum turndown (Issue 1, p2–6), it holds that buyers retain full freedom to fix requisition up to 1430 hrs on D-1 day, but once the schedule is set their downward revision for D day cannot fall below their respective share of the minimum turndown level; the Commission reasons that this protects realistic day-ahead SCUC, on-bar reserves and inertia, and records the practical difficulty of lignite-fired units running below turndown.

On declared capacity (Issue 2, p6–12), it partially modifies the 30.09.2023 order and creates two classes: most generating stations and ESS get a limited number of DC and schedule revisions per day subject to a monthly ceiling, while lignite-based, gas-based and hydro stations get a higher daily and monthly allowance. A digital record of reasons is required and must be verifiable by RLDC/RPC, and NLDC must report on the reasons after three months. This dispensation stands until the Grid Code is amended. Issue 3 (p12) directs that SCED and TRAS schedules be given only to units that are actually on bar, not to shut-down units. Issue 4 (p12–14) allows the Government of Himachal Pradesh — a non-drawee holder of free power in central hydro stations — to sell that free power directly from the generator bus bar, with NLDC to prepare a DSM segregation procedure for approval.

The operative directions issue under Regulation 58 read with Regulation 60 of the Grid Code (p14–15).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Ancillary services and reserves

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document