CERC · Central Electricity Regulatory Commission
Detailed Procedure for SCUC, USD and SCED at Regional Level, 2024 — Approval Order under Indian Electricity Grid Code Regulations, 2023
Approval of "Detailed Procedure for Security Constrained Unit Commitment (SCUC), Unit Shut Down (USD) and Security Constrained Economic Despatch (SCED) at Regional Level" under Regulation 46(4)(i), 47(2), 46(4)(j), 46(5)(a), 46(5)(b) and 49(2)(a)(iv) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023.
ProcedureDated 16 Apr 2024No. L-1/265/2022/CERC dated 16th April 2024
Made under the Indian Electricity Grid Code Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's approval order for the detailed operating procedure that governs how NLDC and RLDCs commit, shut down and economically despatch thermal generating stations at regional level. The two-page order (pp1–2) records that the IEGC 2023 required NLDC to prepare detailed procedures for SCUC, USD and SCED, that NLDC submitted the draft on 29.09.2023 after stakeholder consultation, and that the Commission approves the procedure with changes, effective from the date of issue. NLDC must report feedback one month after six months from the effective date.
The approved procedure itself (Annexure-I, pp3–23) is the substantive instrument. It sets the enabling provisions and objectives (pp4), then scopes the procedure to regional entity thermal generating stations whose tariff is determined under section 62 of the Act and others that opt in — with an opt-in SCUC participant made mandatorily a SCED participant (p4). Definitions cover SCUC-Up and SCUC-Down scheduling heads, hot/warm/cold start windows, and minimum up and down times (pp5).
Chapter 5 allocates roles and responsibilities across NLDC, RLDCs, generating stations, beneficiaries and RPCs — who publishes which list, who prepares entitlements and schedules, what data generators declare (including the NOAR single-point entry for energy and compensation charges), and who issues which accounting statements (pp5–9).
Chapter 6 lays out the SCUC sequence as a timed day-ahead workflow on D-1 — declaration of capability, entitlements, requisitions, publication of a tentative list of units likely to fall below minimum turndown, TRAS-based reserve adequacy arithmetic, revision windows, crew and start-up timelines, and the own merit-order commitment of Cat#1 then Cat#2 units — with specified publication times and freeze points (pp9–15). Chapter 7 governs Unit Shut Down: when a unit may go off bar and how the owning generator must cover its beneficiaries' requisitions through contracts, sister stations or SCED, and the DSM consequences of failure (pp15–16). Chapter 8 specifies the SCED run, its timing after RTM, data declaration obligations and the consent route for a unit wishing to go under USD via SCED (pp16–17).
Chapters 9 and 10 set out accounting and settlement for SCUC and SCED respectively — pool accounts, statement formats and issue timelines, payment windows, interest for delay, and the treatment of part-load heat-rate compensation for section 62 versus non-section 62 generators (pp17–23). The tail of the document supplies the prescribed formats, the SCUC and SCED objective functions and constraints (Annexures 1 and 3), SCUC re-run illustrations (Annexure 2), and the SCED benefit-sharing mechanism (Annexure 4, pp34–35).
Read with this
The regulation
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
Amendments and corrections
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Commencement notices and reasons
- Dated 3 Aug 2023Gazette – effective date 1.10.2023
- Dated 3 Aug 2023Notification – effective date 1.10.2023
- Dated 2 Aug 2024Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 28 Sep 2023Detailed Procedure for Assessment of Secondary & Tertiary Reserve Capacity — Approval Order, 28 September 2023
- Dated 30 Sep 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)
- Dated 18 Dec 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (Second Order)
- Dated 22 Dec 2024Indian Electricity Grid Code Regulations, 2023 — Third Removal of Difficulties Order, 2024
- Dated 12 Feb 2025Black Start Support Payment Procedure
- Dated 12 Mar 2025Detailed Procedure for MTL Support through SCED for Section 62 Generators, IEGC Regulations 2023 — Approval Order, 2025
Other copies of these documents (2)
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Proposed changes (drafts with no final yet)
- Dated 21 Sep 2026Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft
- Dated 21 Sep 2026Explanatory memorandum: Draft IEGC Second Amendment Regulations, 2026 — Explanatory Memorandum
- Dated 21 Sep 2026Public notice: Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Public Notice
- Dated 22 Oct 2026Notice extending the date for comments: Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Extension of last date for comments — Public Notice
- Dated 22 Oct 2026Hearing notice: Public hearing notice on Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 7 Jun 2022Indian Electricity Grid Code Regulations, 2022 — Draft
- Dated 7 Jun 2022Public notice: Draft Indian Electricity Grid Code Regulations, 2022 — Public Notice
- Dated 30 Aug 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 30.09.2022
- Dated 29 Sep 2022Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 29 Sep 2022Hearing notice: Public hearing on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 9 Oct 2022Explanatory memorandum: Draft Indian Electricity Grid Code Regulations, 2022 — Explanatory Memorandum
- Dated 18 Oct 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 31.10.2022 — Public Notice
- Dated 12 Jun 2024Indian Electricity Grid Code Regulations, 2023 — First Amendment, 2024 — Draft
- Released with the notice dated 12 Jun 2024Explanatory memorandum: Indian Electricity Grid Code, 2023 — First Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 12 Jun 2024Public notice: Indian Electricity Grid Code (First Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 31 Jul 2024Hearing notice: Public hearing notice — Draft Indian Electricity Grid Code (First Amendment) Regulations, 2024
6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.