Detailed Procedure for SCUC, USD and SCED at Regional Level, 2024 — Approval Order under Indian Electricity Grid Code Regulations, 2023

Approval of "Detailed Procedure for Security Constrained Unit Commitment (SCUC), Unit Shut Down (USD) and Security Constrained Economic Despatch (SCED) at Regional Level" under Regulation 46(4)(i), 47(2), 46(4)(j), 46(5)(a), 46(5)(b) and 49(2)(a)(iv) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023.

ProcedureDated 16 Apr 2024No. L-1/265/2022/CERC dated 16th April 2024

Made under the Indian Electricity Grid Code Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's approval order for the detailed operating procedure that governs how NLDC and RLDCs commit, shut down and economically despatch thermal generating stations at regional level. The two-page order (pp1–2) records that the IEGC 2023 required NLDC to prepare detailed procedures for SCUC, USD and SCED, that NLDC submitted the draft on 29.09.2023 after stakeholder consultation, and that the Commission approves the procedure with changes, effective from the date of issue. NLDC must report feedback one month after six months from the effective date.

The approved procedure itself (Annexure-I, pp3–23) is the substantive instrument. It sets the enabling provisions and objectives (pp4), then scopes the procedure to regional entity thermal generating stations whose tariff is determined under section 62 of the Act and others that opt in — with an opt-in SCUC participant made mandatorily a SCED participant (p4). Definitions cover SCUC-Up and SCUC-Down scheduling heads, hot/warm/cold start windows, and minimum up and down times (pp5).

Chapter 5 allocates roles and responsibilities across NLDC, RLDCs, generating stations, beneficiaries and RPCs — who publishes which list, who prepares entitlements and schedules, what data generators declare (including the NOAR single-point entry for energy and compensation charges), and who issues which accounting statements (pp5–9).

Chapter 6 lays out the SCUC sequence as a timed day-ahead workflow on D-1 — declaration of capability, entitlements, requisitions, publication of a tentative list of units likely to fall below minimum turndown, TRAS-based reserve adequacy arithmetic, revision windows, crew and start-up timelines, and the own merit-order commitment of Cat#1 then Cat#2 units — with specified publication times and freeze points (pp9–15). Chapter 7 governs Unit Shut Down: when a unit may go off bar and how the owning generator must cover its beneficiaries' requisitions through contracts, sister stations or SCED, and the DSM consequences of failure (pp15–16). Chapter 8 specifies the SCED run, its timing after RTM, data declaration obligations and the consent route for a unit wishing to go under USD via SCED (pp16–17).

Chapters 9 and 10 set out accounting and settlement for SCUC and SCED respectively — pool accounts, statement formats and issue timelines, payment windows, interest for delay, and the treatment of part-load heat-rate compensation for section 62 versus non-section 62 generators (pp17–23). The tail of the document supplies the prescribed formats, the SCUC and SCED objective functions and constraints (Annexures 1 and 3), SCUC re-run illustrations (Annexure 2), and the SCED benefit-sharing mechanism (Annexure 4, pp34–35).

Standard name
Grid Code
Primary topics
Scheduling and despatch, Ancillary services and reserves, Energy accounting and settlement

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.