Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code Regulations, 2023 — First Amendment, 2024 — Draft

Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2024

Draft amendmentDated 12 Jun 2024L-1/265/2022/CERC dated 12.06.2024

Draft

A proposal that has since been finalised as the Indian Electricity Grid Code (First Amendment) Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's draft of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2024, issued on 12.06.2024 under s.79(1)(h) read with s.178(2)(g) of the Electricity Act, 2003. It proposes targeted changes to the Indian Electricity Grid Code Regulations, 2023 (published 03.08.2023, per the Note at p6) and is aimed at regional entities — generating stations, renewable energy generating stations (REGS) and energy storage systems — and at the RLDC/NLDC that despatch them.

Paragraph 1 names the regulations and fixes commencement: they take effect on a date the Commission will notify, except the change to Regulation 45(12), which is to run from 1.04.2024 (p1).

The amendments then follow in regulation order. Regulation 19 is changed to cap infirm power injection — one year from first synchronization for conventional stations, 45 days from FTC approval for REGS and ESS — with a proviso allowing RLDCs to extend by up to six months and the Commission beyond that, on advance application (p1–2). Regulation 22 relaxes how design capability is demonstrated at trial run, allows COD to be declared on available reservoir levels with demonstration deferred to when water is sufficient, and gives a repeat-trial or de-rating option effective from COD (p2–3). The definition of 'D' in Regulation 27(2) is recast (p3).

Regulation 45's provisos on part-load compensation are replaced, separating thermal stations by whether their tariff is adopted under s.63 or determined under s.62 (p3). The largest block is Regulation 49 (p3–6): the consent condition in sub-clause (1)(l) is changed; a new sub-clause (2)(a)(v-a) provides for SCED adjustment where a station is scheduled below minimum turndown level in off-peak hours but above it in peak hours, including who bears the charge difference; a proviso sets a floor on buyers' downward schedule revisions; and new Clause (7-a) confines declared-capacity and schedule revisions to bilateral transactions, with separate daily and monthly caps for most stations and for lignite, gas and hydro.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Generation tariff

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document