CERC · Central Electricity Regulatory Commission
Indian Electricity Grid Code Regulations, 2023 — First Amendment, 2024 — Draft
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2024
Draft amendmentDated 12 Jun 2024L-1/265/2022/CERC dated 12.06.2024
Draft
A proposal that has since been finalised as the Indian Electricity Grid Code (First Amendment) Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's draft of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2024, issued on 12.06.2024 under s.79(1)(h) read with s.178(2)(g) of the Electricity Act, 2003. It proposes targeted changes to the Indian Electricity Grid Code Regulations, 2023 (published 03.08.2023, per the Note at p6) and is aimed at regional entities — generating stations, renewable energy generating stations (REGS) and energy storage systems — and at the RLDC/NLDC that despatch them.
Paragraph 1 names the regulations and fixes commencement: they take effect on a date the Commission will notify, except the change to Regulation 45(12), which is to run from 1.04.2024 (p1).
The amendments then follow in regulation order. Regulation 19 is changed to cap infirm power injection — one year from first synchronization for conventional stations, 45 days from FTC approval for REGS and ESS — with a proviso allowing RLDCs to extend by up to six months and the Commission beyond that, on advance application (p1–2). Regulation 22 relaxes how design capability is demonstrated at trial run, allows COD to be declared on available reservoir levels with demonstration deferred to when water is sufficient, and gives a repeat-trial or de-rating option effective from COD (p2–3). The definition of 'D' in Regulation 27(2) is recast (p3).
Regulation 45's provisos on part-load compensation are replaced, separating thermal stations by whether their tariff is adopted under s.63 or determined under s.62 (p3). The largest block is Regulation 49 (p3–6): the consent condition in sub-clause (1)(l) is changed; a new sub-clause (2)(a)(v-a) provides for SCED adjustment where a station is scheduled below minimum turndown level in off-peak hours but above it in peak hours, including who bears the charge difference; a proviso sets a floor on buyers' downward schedule revisions; and new Clause (7-a) confines declared-capacity and schedule revisions to bilateral transactions, with separate daily and monthly caps for most stations and for lignite, gas and hydro.
Read with this
The regulation
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
Amendments and corrections
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Commencement notices and reasons
- Dated 3 Aug 2023Gazette – effective date 1.10.2023
- Dated 3 Aug 2023Notification – effective date 1.10.2023
- Dated 2 Aug 2024Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 28 Sep 2023Detailed Procedure for Assessment of Secondary & Tertiary Reserve Capacity — Approval Order, 28 September 2023
- Dated 30 Sep 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)
- Dated 18 Dec 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (Second Order)
- Dated 16 Apr 2024Detailed Procedure for SCUC, USD and SCED at Regional Level, 2024 — Approval Order under Indian Electricity Grid Code Regulations, 2023
- Dated 22 Dec 2024Indian Electricity Grid Code Regulations, 2023 — Third Removal of Difficulties Order, 2024
- Dated 12 Feb 2025Black Start Support Payment Procedure
- Dated 12 Mar 2025Detailed Procedure for MTL Support through SCED for Section 62 Generators, IEGC Regulations 2023 — Approval Order, 2025
Other copies of these documents (2)
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Proposed changes (drafts with no final yet)
- Dated 21 Sep 2026Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft
- Dated 21 Sep 2026Explanatory memorandum: Draft IEGC Second Amendment Regulations, 2026 — Explanatory Memorandum
- Dated 21 Sep 2026Public notice: Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Public Notice
- Dated 22 Oct 2026Notice extending the date for comments: Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Extension of last date for comments — Public Notice
- Dated 22 Oct 2026Hearing notice: Public hearing notice on Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 7 Jun 2022Indian Electricity Grid Code Regulations, 2022 — Draft
- Dated 7 Jun 2022Public notice: Draft Indian Electricity Grid Code Regulations, 2022 — Public Notice
- Dated 30 Aug 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 30.09.2022
- Dated 29 Sep 2022Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 29 Sep 2022Hearing notice: Public hearing on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 9 Oct 2022Explanatory memorandum: Draft Indian Electricity Grid Code Regulations, 2022 — Explanatory Memorandum
- Dated 18 Oct 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 31.10.2022 — Public Notice
- Released with the notice dated 12 Jun 2024Explanatory memorandum: Indian Electricity Grid Code, 2023 — First Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 12 Jun 2024Public notice: Indian Electricity Grid Code (First Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 31 Jul 2024Hearing notice: Public hearing notice — Draft Indian Electricity Grid Code (First Amendment) Regulations, 2024
6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.