Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's explanatory memorandum for the draft first amendment to the Indian Electricity Grid Code Regulations, 2023. It argues the case for each change and does not reproduce the amendment text itself (p1).
The background section records that the Principal Regulations were notified on 29.05.2023 and made effective 01.10.2023, and that difficulties raised by stakeholders were partly dealt with through suo-motu orders of 30.09.2023 and 18.12.2023; those directions are now to be carried into the Regulations, with the detailed reasoning left to those orders rather than repeated (p1).
The proposed changes then run regulation by regulation. Regulation 27's 'D' is to be read as the date a generating station intimates commercial operation, with scheduling beginning from 0000 hours of D+2 (p1–2). Regulation 22 is relaxed so pumped storage plants may declare COD at available reservoir levels, with a de-rating route if design capability is never demonstrated (p2). Regulation 49 is touched four times: Section 62 stations may sell un-requisitioned surplus in the day-ahead market without beneficiary consent; buyers may not revise schedules downward after 1430 hrs on D-1 below their share of the station's minimum turndown level, illustrated by a worked example (p2–3); a new clause caps daily and monthly revisions of declared capacity and schedule, with different limits for lignite, gas and hydro units (p3–4); and SCED adjustment is extended to part drawal schedules (p10–11).
Regulation 19 is tightened so infirm power injection for RE generators and storage stops 45 days after first-time charging approval, against one year for other stations, with extension routes through the RLDC and the Commission (p4–6). The wind trial-run test becomes four cumulative hours in a single day rather than four continuous hours (p6–7). Regulation 45 is recast so part load compensation for Section 62 thermal stations follows the applicable Tariff Regulations, proposed with effect from 1.4.2024, while Section 63 stations keep the 2010 Grid Code mechanism (p7–10). Finally, a new Regulation 49(2)(a)(v-a) sets out SCED adjustment for stations scheduled below MTL off-peak but above it in peak hours, and who bears the cost difference (p11–14).
Read with this
The regulation
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
Amendments and corrections
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Commencement notices and reasons
- Dated 3 Aug 2023Gazette – effective date 1.10.2023
- Dated 3 Aug 2023Notification – effective date 1.10.2023
- Dated 2 Aug 2024Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 28 Sep 2023Detailed Procedure for Assessment of Secondary & Tertiary Reserve Capacity — Approval Order, 28 September 2023
- Dated 30 Sep 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)
- Dated 18 Dec 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (Second Order)
- Dated 16 Apr 2024Detailed Procedure for SCUC, USD and SCED at Regional Level, 2024 — Approval Order under Indian Electricity Grid Code Regulations, 2023
- Dated 22 Dec 2024Indian Electricity Grid Code Regulations, 2023 — Third Removal of Difficulties Order, 2024
- Dated 12 Feb 2025Black Start Support Payment Procedure
- Dated 12 Mar 2025Detailed Procedure for MTL Support through SCED for Section 62 Generators, IEGC Regulations 2023 — Approval Order, 2025
Other copies of these documents (2)
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Proposed changes (drafts with no final yet)
- Dated 21 Sep 2026Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft
- Dated 21 Sep 2026Explanatory memorandum: Draft IEGC Second Amendment Regulations, 2026 — Explanatory Memorandum
- Dated 21 Sep 2026Public notice: Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Public Notice
- Dated 22 Oct 2026Notice extending the date for comments: Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Extension of last date for comments — Public Notice
- Dated 22 Oct 2026Hearing notice: Public hearing notice on Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 7 Jun 2022Indian Electricity Grid Code Regulations, 2022 — Draft
- Dated 7 Jun 2022Public notice: Draft Indian Electricity Grid Code Regulations, 2022 — Public Notice
- Dated 30 Aug 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 30.09.2022
- Dated 29 Sep 2022Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 29 Sep 2022Hearing notice: Public hearing on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 9 Oct 2022Explanatory memorandum: Draft Indian Electricity Grid Code Regulations, 2022 — Explanatory Memorandum
- Dated 18 Oct 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 31.10.2022 — Public Notice
- Dated 12 Jun 2024Indian Electricity Grid Code Regulations, 2023 — First Amendment, 2024 — Draft
- Dated 12 Jun 2024Public notice: Indian Electricity Grid Code (First Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 31 Jul 2024Hearing notice: Public hearing notice — Draft Indian Electricity Grid Code (First Amendment) Regulations, 2024
6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.