Indian Electricity Grid Code, 2023 — First Amendment, 2024 — Explanatory Memorandum — Draft

Explanatory Memorandum

Explanatory memorandum to a draftReleased with the notice dated 12 Jun 2024

Draft

The draft has since been finalised as the Indian Electricity Grid Code (First Amendment) Regulations, 2024.

Explanatory memorandum to the Indian Electricity Grid Code Regulations, 2023 — First Amendment, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's explanatory memorandum for the draft first amendment to the Indian Electricity Grid Code Regulations, 2023. It argues the case for each change and does not reproduce the amendment text itself (p1).

The background section records that the Principal Regulations were notified on 29.05.2023 and made effective 01.10.2023, and that difficulties raised by stakeholders were partly dealt with through suo-motu orders of 30.09.2023 and 18.12.2023; those directions are now to be carried into the Regulations, with the detailed reasoning left to those orders rather than repeated (p1).

The proposed changes then run regulation by regulation. Regulation 27's 'D' is to be read as the date a generating station intimates commercial operation, with scheduling beginning from 0000 hours of D+2 (p1–2). Regulation 22 is relaxed so pumped storage plants may declare COD at available reservoir levels, with a de-rating route if design capability is never demonstrated (p2). Regulation 49 is touched four times: Section 62 stations may sell un-requisitioned surplus in the day-ahead market without beneficiary consent; buyers may not revise schedules downward after 1430 hrs on D-1 below their share of the station's minimum turndown level, illustrated by a worked example (p2–3); a new clause caps daily and monthly revisions of declared capacity and schedule, with different limits for lignite, gas and hydro units (p3–4); and SCED adjustment is extended to part drawal schedules (p10–11).

Regulation 19 is tightened so infirm power injection for RE generators and storage stops 45 days after first-time charging approval, against one year for other stations, with extension routes through the RLDC and the Commission (p4–6). The wind trial-run test becomes four cumulative hours in a single day rather than four continuous hours (p6–7). Regulation 45 is recast so part load compensation for Section 62 thermal stations follows the applicable Tariff Regulations, proposed with effect from 1.4.2024, while Section 63 stations keep the 2010 Grid Code mechanism (p7–10). Finally, a new Regulation 49(2)(a)(v-a) sets out SCED adjustment for stations scheduled below MTL off-peak but above it in peak hours, and who bears the cost difference (p11–14).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Power markets and exchanges

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document