CERC · Central Electricity Regulatory Commission
Indian Electricity Grid Code Regulations, 2022 — Draft
Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2022
Draft regulationDated 7 Jun 2022No. L-1/265/2022/CERC
Draft
A proposal that has since been finalised as the Indian Electricity Grid Code Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a draft CERC notification for the Indian Electricity Grid Code, 2022. Its preamble locates the Grid Code in the Electricity Act 2003 and the statutory roles of CEA, RPCs, CTU, NLDC, RLDCs, STUs, SLDCs, generating companies and licensees; it also cites the Supreme Court's 2007 judgment on State Grid Codes being consistent with the central Grid Code (p1–3). The notification clause invokes s.79(1)(h) read with s.178(2)(g) of the Act and states that the regulations will come into force from a date notified by the Commission (p4).
Chapter 1 sets the short title and commencement, applies the Code to all users, SLDCs, RLDCs, NLDC, CTU, STUs, licensees, RPCs and power exchanges to the extent applicable, and treats DVC as a regional entity and separate control area, BBMB and SSP stations as regional entities, and any interconnected country as a separate control area (p4–5). Regulation 3 carries a long definition table of 125 entries covering grid operations, ancillary services, reserves, control areas, GNA, renewable and storage entities, and settlement terms (p5–23).
Chapter 2 is the Resource Planning Code. It requires distribution licensees to forecast demand for five years and submit to the STU by 31 July; STUs to aggregate state demand by 30 August; STUs to provide data to NLDC by 30 September; and NLDC to run a national simulation by 31 October. It sets generation resource adequacy planning and procurement-plan requirements, with SERC-approved adequacy targets and possible noncompliance charges. It also assigns CTU and STU transmission resource adequacy assessments (p24–28).
Chapter 3 is the Connection Code. It routes ISTS connectivity through CTU under the GNA Regulations, requires NLDC to publish a first-energization procedure, sets joint system studies before energization, and covers connectivity agreements, technical requirements and communication/data facilities (p29–32).
Chapter 4 is the Protection Code. It requires a uniform protection protocol, RPC-reviewed protection settings, a centralized relay-setting database, annual internal audits and five-yearly third-party audits at 220 kV and above (132 kV and above in NER), system protection schemes, disturbance recorders and event loggers (p33–37).
Chapter 5 is the Commissioning and Commercial Operation Code. It governs start-up power drawal and infirm power injection, trial-run notice and data, and conditions for commercial operation (p38–41).
Annexure 1 provides the protection-audit checking and validation format and summary requirements (p145–148). Annexure 2 sets the method for reference contingency, all-India frequency response characteristic, control-area frequency response obligation and performance grading (p149–156). Annexure 3 estimates secondary and tertiary reserves from 99th-percentile ACE and allocates them across regions and states (p157–158). Annexure 4 covers reactive power compensation, VAr exchange pricing and settlement (p159–162). Annexure 5 sets data, forecasting and scheduling procedures for renewable energy generating stations, including QCA/lead-generator cases and appendices (p163–182). Annexure 6 covers accounting and pool settlement (p183–184). Annexure 7 lists reporting and procedure-drafting responsibilities by entity (p185–188).
Read with this
The regulation
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
Amendments and corrections
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Commencement notices and reasons
- Dated 3 Aug 2023Gazette – effective date 1.10.2023
- Dated 3 Aug 2023Notification – effective date 1.10.2023
- Dated 2 Aug 2024Indian Electricity Grid Code Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 28 Sep 2023Detailed Procedure for Assessment of Secondary & Tertiary Reserve Capacity — Approval Order, 28 September 2023
- Dated 30 Sep 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (First Order)
- Dated 18 Dec 2023Indian Electricity Grid Code Regulations, 2023 — Removal of Difficulties (Second Order)
- Dated 16 Apr 2024Detailed Procedure for SCUC, USD and SCED at Regional Level, 2024 — Approval Order under Indian Electricity Grid Code Regulations, 2023
- Dated 22 Dec 2024Indian Electricity Grid Code Regulations, 2023 — Third Removal of Difficulties Order, 2024
- Dated 12 Feb 2025Black Start Support Payment Procedure
- Dated 12 Mar 2025Detailed Procedure for MTL Support through SCED for Section 62 Generators, IEGC Regulations 2023 — Approval Order, 2025
Other copies of these documents (2)
- Dated 29 May 2023Indian Electricity Grid Code Regulations, 2023
- Dated 23 Oct 2024Indian Electricity Grid Code (First Amendment) Regulations, 2024
Proposed changes (drafts with no final yet)
- Dated 21 Sep 2026Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Draft
- Dated 21 Sep 2026Explanatory memorandum: Draft IEGC Second Amendment Regulations, 2026 — Explanatory Memorandum
- Dated 21 Sep 2026Public notice: Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Public Notice
- Dated 22 Oct 2026Notice extending the date for comments: Indian Electricity Grid Code (Second Amendment) Regulations, 2026 — Extension of last date for comments — Public Notice
- Dated 22 Oct 2026Hearing notice: Public hearing notice on Draft Indian Electricity Grid Code (Second Amendment) Regulations, 2026
Earlier drafts
- Dated 12 Jun 2024Indian Electricity Grid Code Regulations, 2023 — First Amendment, 2024 — Draft
- Released with the notice dated 12 Jun 2024Explanatory memorandum: Indian Electricity Grid Code, 2023 — First Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 12 Jun 2024Public notice: Indian Electricity Grid Code (First Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 31 Jul 2024Hearing notice: Public hearing notice — Draft Indian Electricity Grid Code (First Amendment) Regulations, 2024
- Dated 7 Jun 2022Public notice: Draft Indian Electricity Grid Code Regulations, 2022 — Public Notice
- Dated 30 Aug 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 30.09.2022
- Dated 29 Sep 2022Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 29 Sep 2022Hearing notice: Public hearing on Draft Indian Electricity Grid Code Regulations, 2022
- Dated 9 Oct 2022Explanatory memorandum: Draft Indian Electricity Grid Code Regulations, 2022 — Explanatory Memorandum
- Dated 18 Oct 2022Notice extending the date for comments: Draft Indian Electricity Grid Code Regulations, 2022 — Extension of comment deadline to 31.10.2022 — Public Notice
6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.