Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code Regulations, 2022 — Draft

Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2022

Draft regulationDated 7 Jun 2022No. L-1/265/2022/CERC

Draft

A proposal that has since been finalised as the Indian Electricity Grid Code Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a draft CERC notification for the Indian Electricity Grid Code, 2022. Its preamble locates the Grid Code in the Electricity Act 2003 and the statutory roles of CEA, RPCs, CTU, NLDC, RLDCs, STUs, SLDCs, generating companies and licensees; it also cites the Supreme Court's 2007 judgment on State Grid Codes being consistent with the central Grid Code (p1–3). The notification clause invokes s.79(1)(h) read with s.178(2)(g) of the Act and states that the regulations will come into force from a date notified by the Commission (p4).

Chapter 1 sets the short title and commencement, applies the Code to all users, SLDCs, RLDCs, NLDC, CTU, STUs, licensees, RPCs and power exchanges to the extent applicable, and treats DVC as a regional entity and separate control area, BBMB and SSP stations as regional entities, and any interconnected country as a separate control area (p4–5). Regulation 3 carries a long definition table of 125 entries covering grid operations, ancillary services, reserves, control areas, GNA, renewable and storage entities, and settlement terms (p5–23).

Chapter 2 is the Resource Planning Code. It requires distribution licensees to forecast demand for five years and submit to the STU by 31 July; STUs to aggregate state demand by 30 August; STUs to provide data to NLDC by 30 September; and NLDC to run a national simulation by 31 October. It sets generation resource adequacy planning and procurement-plan requirements, with SERC-approved adequacy targets and possible noncompliance charges. It also assigns CTU and STU transmission resource adequacy assessments (p24–28).

Chapter 3 is the Connection Code. It routes ISTS connectivity through CTU under the GNA Regulations, requires NLDC to publish a first-energization procedure, sets joint system studies before energization, and covers connectivity agreements, technical requirements and communication/data facilities (p29–32).

Chapter 4 is the Protection Code. It requires a uniform protection protocol, RPC-reviewed protection settings, a centralized relay-setting database, annual internal audits and five-yearly third-party audits at 220 kV and above (132 kV and above in NER), system protection schemes, disturbance recorders and event loggers (p33–37).

Chapter 5 is the Commissioning and Commercial Operation Code. It governs start-up power drawal and infirm power injection, trial-run notice and data, and conditions for commercial operation (p38–41).

Annexure 1 provides the protection-audit checking and validation format and summary requirements (p145–148). Annexure 2 sets the method for reference contingency, all-India frequency response characteristic, control-area frequency response obligation and performance grading (p149–156). Annexure 3 estimates secondary and tertiary reserves from 99th-percentile ACE and allocates them across regions and states (p157–158). Annexure 4 covers reactive power compensation, VAr exchange pricing and settlement (p159–162). Annexure 5 sets data, forecasting and scheduling procedures for renewable energy generating stations, including QCA/lead-generator cases and appendices (p163–182). Annexure 6 covers accounting and pool settlement (p183–184). Annexure 7 lists reporting and procedure-drafting responsibilities by entity (p185–188).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Resource adequacy, Connectivity and GNA

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document