Procurement of Energy from Renewable Sources Regulations, 2026 — Draft
Draft- KARNATAKA ELECTRICITY REGULATORY COMMISSION › DRAFT Regulations… (a) consumption of renewable energy from captive source or purchase of RE from any other source including purchase of RE from traders or market or through an energy storage system; …
- KARNATAKA ELECTRICITY REGULATORY COMMISSION › DRAFT Regulations… 4 --> the Energy Conservation Act, 2001, as amended from time to time or any reenactment thereof, for the minimum share of consumption of non-fossil sources (renewable energy); (n) …
3 matching passages in this document
Connectivity and General Network Access to Intra-State Transmission and State Distribution System Regulations, 2026 — Draft
Draft- 2 Definitions › The Secretary, Karnataka Electricity Regulatory Commission, …"Renewable Energy Generating Station" or "REGS" means a generating station based on a renewable source of energy with or without Energy Storage System and shall include Renewable Hybrid Generating Station; (ii) "Renewable Energy …
- 2 Definitions › The Secretary, Karnataka Electricity Regulatory Commission, …"Energy Storage System" or "ESS" in relation to the electricity system, means a facility where electrical energy is converted into any form of energy which can be stored, and subsequently reconverted into electrical energy and injected …
3 matching passages in this document
Karnataka Electricity Distribution Code (KEDC), 2024 — Draft
Draft- 3.5 Energy Audit3.5 Energy Audit: The Distribution Licensee shall create responsibility centers for energy audit. Distribution sub-Division and Division in charge of Operation and Maintenance shall be made as responsibility centers and accountable for the …
- d) Geographical Information System (GIS)- Consumer Indexing … › 1. Geo coordinates controlled Asset record management… This will also facilitate conducting energy audit by estimating correctly the energy sales on the 11 kV Feeder / DTC and account for energy supplied to the 11 kV Feeder / DTC. 6. Commercial operations and O&M staff tagged to the assets …
3 matching passages in this document
Draft Electricity Supply Regulations, 2026 — Consolidated
Draft- 2. Compliance of Technical Standards › 9.9. Metering of Building with mixed loads… on LT side shall be provided and the energy so recorded in the sub-meter(s) shall be billed at the appropriate L.T. Commercial / EV Charging/STP/WTP Tariff. The consumption of Sub meter(s) shall be deducted from the energy recorded in …
- 2. Compliance of Technical Standards › 9.10. Resale of Energy… Resale of Energy: 1. The Consumer shall not supply part or whole of the energy supplied to him by the Licensee to another person unless he holds a suitable sanction or licence for distribution and sale of energy granted by the Commission …
3 matching passages in this document
Grid Interactive Distributed Solar PV (DSPV) Plants Regulations, 2026 — Draft
Draft· finalised as Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants Regulations, 2026- 3. Scope and applicability… shall install hybrid inverters/battery energy storage system with a minimum storage capacity of 20% of the energy generation potential of the plant. 3.4. Consumers having pending arrears with the distribution licensee shall not be …
- 1. Short title and commencement › 2. Definitions… of Section 86 of the Act to fulfil the renewable purchase obligation. u) "Power Purchase Agreement (PPA)" means an agreement entered into by the distribution licensee with the eligible consumers. v) "PPA period" shall mean PPA for a …
3 matching passages in this document
Framework for Resource Adequacy Regulations, 2024 — Draft
Draft· finalised as Framework for Resource Adequacy Regulations, 2024- 6. Short-term and Long-term Demand Forecast › Chapter 4 Generation Resource Planning… l) Renewable Purchase Obligation (RPO), Energy Storage Obligation targets, etc. 9.2. The projected hourly or sub-hourly or time interval as may be notified by the Commission from time to time demand for the future years shall be used as …
- 6. Short-term and Long-term Demand Forecast › RAR3 = contribution4 to forecasted national peak demand in …… Fulfilment of Renewable purchase obligation should be considered as one of the objectives of Resource Adequacy. Technology options like renewable generation for round the clock energy supply backed with storage (Battery and PSP), …
2 matching passages in this document
Multi Year Transmission, Distribution and Retail Supply Tariff Regulations, 2023 — Draft
Draft· finalised as Multi Year Transmission, Distribution and Retail Supply Tariff Regulations, 2024Procurement of Energy from Renewable Sources (Eleventh Amendment) Regulations, 2024 — Draft
- Karnataka Electricity Regulatory Commission (Procurement of … › Regulations… The other renewable energy component may be met by energy produced from any renewable energy power project other than specified in sub clause (ii), (iii), and (iv) and shall comprise energy from all WPPs and Hydro Power Projects …
- Karnataka Electricity Regulatory Commission (Procurement of … › Regulations(iii) The hydro renewable energy component shall be met only by energy produced from Hydro Power Projects [including Pump Storage Projects (PSPs) and Small Hydro Projects (SHPs)], commissioned after the 31st March, 2024: Year Wind RE Hydro …
2 matching passages in this document
Ancillary Services Regulations, 2024 — Draft
Draft· finalised as Ancillary Services Regulations, 2025Draft Karnataka Electricity Grid Code (KEGC) Regulations, 2024
Draft· finalised as Karnataka Electricity Grid Code (KEGC), 2025Generation Tariff Regulations, 2024 — Draft
Draft· finalised as Generation Tariff Regulations, 2024- (D) Secondary Fuel Oil Consumption › 70. Norms of Operation for Hydro Generating Stations… beneficiaries shall be entitled to an equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours, …
- 66. Computation and Payment of Capacity Charge and Energy …… Computation and Payment of Capacity Charge and Energy Charge for Pumped Storage Hydro Generating Stations: (1) The fixed cost of a pumped storage hydro generating station shall be computed on an annual basis, based on norms specified …
2 matching passages in this document
Terms and Conditions for Open Access (OA) Regulations, 2025 — Draft
Draft· finalised as Terms and Conditions for Open Access Regulations, 2025