Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Draft

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2020

Draft amendmentDated 1 Jun 2020No.L-1/236/2018/CERC dated 1st June, 2020

Draft

A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2019 — Second Amendment, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft CERC notification dated 1 June 2020 proposing the Tariff (Second Amendment) Regulations, 2020 to the CERC (Terms and Conditions of Tariff) Regulations, 2019. Its central purpose is to bring coal and lignite "integrated mines" — mines allocated to a generating company for one or more of its specified end-use stations whose tariff CERC determines — inside the tariff framework (p1–2).

The draft rewrites parts of Regulation 3 (definitions), adding concepts such as Annual Target Quantity, Date of Commencement of Production, Escrow account, Loading Point, Mine Infrastructure, Mining Plan and Peak Rated Capacity, and aligning the definitions of capital cost, existing project, date of commercial operation and O&M with integrated mines (p2–6). Regulation 4 adds "tonne" and "year" for mines (p6), and Regulation 5 defines when an integrated mine attains commercial operation (p7). New Regulation 7A sets the input price for coal or lignite supplied before commercial operation (p8), Regulation 9 requires a separate petition to determine input price within a stated window, and Regulation 10 prescribes the petition format plus an in-principle approval route for additional capitalisation above a threshold (p9–10).

Most of the substance sits in new Chapter 9 Regulations 36A–36S, which build the whole input-price methodology: components (run-of-mine cost plus additional charges), ROM cost formulas for auctioned, allotted and lignite mines, additional charges, capital cost and additional capital expenditure, annual extraction cost, capital structure/return on equity, depreciation, O&M, working capital, mine closure, and the overburden, GCV and non-tariff-income adjustments, credit adjustment notes, third-party quality measurement and a special provision disapplying Chapters 5–8 to mines (p13–35).

Amendments to Regulations 6, 59 and 71 deal with transmission-charge liability mismatch (cross-referencing the Sharing Regulations, 2020), the order in which payments are adjusted, and a plant-specific addition (p8, p36). The amendments take effect from 1 April 2019, except Regulations 6 and 59, which apply from gazette notification (p1).

Standard name
Tariff Regulations
Primary topics
Fuel price and supply, Tariff determination, Capital cost and investment

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.