Terms and Conditions of Tariff Regulations, 2019 — Second Amendment, 2021

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2021

AmendmentDated 19 Feb 2021No.L-1/236/2018/CERC dated 19th February, 2021

Replaced by Terms and Conditions of Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Terms and Conditions of Tariff Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's second amendment to its 2019 Tariff Regulations, issued on 19 February 2021, and it is almost entirely about one new subject: the treatment of integrated coal and lignite mines owned by generating companies whose tariff the Commission determines. The amendment is framed as a series of insertions and substitutions to the Principal Regulations (p1).

The opening clauses (p1) give the short title and state that the regulations apply for the 2019–24 tariff period, except the changes to Regulations 6 and 59, which take effect from Gazette notification. A new application clause limits the new mine regime to generating companies with coal or lignite from an integrated mine allocated to them for specified end-use stations (p1–2). Sections 3 and 4 (p2–6) rewrite the definitional machinery, adding or substituting terms specific to mining — Annual Target Quantity, Capital Cost, Date of Commercial Operation, Date of Commencement of Production, Escrow account, Existing Project, Loading Point, Mine Infrastructure, Mining Plan, Peak Rated Capacity, tonne and Year — and adjusting provisions on investment approval funding/timelines and the exclusion of mining charges and mine closure expenses from O&M (p4–5).

Section 5 (p6–7) sets how the date of commercial operation of an integrated mine is declared, including Commission-approved alternative dates and beneficiary notice. Regulation 6 is deleted outright (p7). A new Regulation 7A (p7–8) prices coal or lignite supplied before the mine's COD; Regulation 9 (p8) requires the generating company to file an input-price petition within 60 days of COD or of notification of these regulations, whichever is later, and Regulation 10 requires that petition in the format at Annexure-I (Part IV) (p8). Later sections amend Regulations 11, 13, 16, 22 and the title of Chapter 9, and rewrite Regulation 36 so the input price is determined under these regulations rather than a separate notification (p8–11).

The bulk of the document is the new Chapter 9, Regulations 36A to 36S (p11–31), which creates a self-contained input-price regime for integrated mines: cost components and formulae for Run of Mine cost and additional charges, capital cost and additional capital expenditure, annual extraction cost, capital structure, depreciation, O&M, working capital, mine closure through an escrow account, determination and recovery of input price, overburden, GCV and non-tariff income adjustments settled by credit adjustment note, third-party quality measurement, and a clause disapplying Chapters 5 to 8 to mines. Sections 17 and 18 (p31–32) change the order of adjustment of payments towards late payment surcharge and constrain upward revision of mutually agreed lower tariffs at truing up. Appendix IA (p33) gives the depreciation schedule for integrated mines.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document