Terms and Conditions of Tariff Regulations, 2019 — Fourth Amendment, 2023 — Explanatory Memorandum — Draft

Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Fourth Amendment) Regulations, 2023"

Explanatory memorandum to a draftReleased with the notice dated 10 Sep 2023

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Explanatory Memorandum for the draft CERC (Terms and Conditions of Tariff) (Fourth Amendment) Regulations, 2023 (p1). It is a reasons document rather than the amendment itself: the whole of Section 1 sets out the background to, and justification for, the proposed change.

The memorandum recalls that the Commission has specified terms and conditions of tariff, including multi-year tariff (MYT) regulations, since 1998, for successive control periods running up to 2019–24 (p1). It notes that the 2019 Principal Regulations — made under s.178(2)(s) read with ss.61 and 62 of the Electricity Act, 2003 — cover central generating companies, generating companies with composite schemes of sale or purchase to more than one State, and inter-State transmission (p1).

The core subject is Regulation 17 of the MYT Regulations, 2019, which provides special provisions for thermal generating stations that have completed 25 years from their date of commercial operation: an optional generator–beneficiary arrangement under which capacity charges as well as energy charges are recovered on scheduled generation, with the beneficiary holding a first right of refusal. The memorandum reproduces the regulation (p1–2) and the relevant portion of the Statement of Objects and Reasons to the 2019 regulations (p2), confirming the provision was intended to be optional and enabling.

Paragraphs 1.7 to 1.9 give the Commission's reasons for change: commercial terms between generator and beneficiaries sit in long-term PPAs valid for the life of the contract, stations often run beyond PPA tenure, and a unilateral exit clause introduced through five-yearly tariff regulations may breach contractual sanctity and be inequitable. Stakeholders are said to argue that parties can negotiate freely once the PPA term ends, that fastening a unilateral right on one party complicates negotiation between equal parties, and that arrangements under Regulation 17 have rarely been worked out. The memorandum therefore proposes to omit Regulation 17 (p3).

Standard name
Multi Year Tariff Regulations
Primary topics
Tariff determination, Generation tariff

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗