CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2019 — Third Amendment, 2023

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2023

Amendment · Gazette copyDated 15 Dec 2023Published in the Gazette 26 Dec 2023No. L-1/236/2018/CERC dated 15th December, 2023

Replaced by Terms and Conditions of Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Terms and Conditions of Tariff Regulations, 2019 — Third Amendment, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a gazette notification of the Central Electricity Regulatory Commission (CERC) amending the CERC (Terms and Conditions of Tariff) Regulations, 2019 (p2). It is the Third Amendment, made under section 178(2)(s) read with section 61 of the Electricity Act, 2003 (p2). It comes into force on the date of publication in the official Gazette, which is 26 December 2023 (p1–2). The notification is dated 15 December 2023 (p2).

Clause 1 gives the short title and commencement (p2). Clause 2 adds a new sub-clause (iii) after sub-clause (ii) of Clause (4) under Appendix-II of the Principal Regulations (p2). This new provision concerns shutdown of a transmission line due to shifting, modification, or projects of NHAI, Railways, and Border Road Organisation; it allows the Member Secretary, RPC to restrict the deemed availability period, with a proviso that DICs are not affected (p2). Clause 3 adds a new sub-clause (iii) after sub-clause (ii) of Clause (5) under Appendix-II (p3). This provision sets out who may declare an outage period to be excluded, with a tiered structure: up to a limited period by Member Secretary, RPC; beyond that up to a longer period after a decision at RPC; and beyond that by the Commission, with the transmission licensee required to approach the Commission with reasons, mitigation steps, and a restoration timeline (p3). A Note on p3 lists the Principal Regulations of 2019 and its First and Second Amendments, with their Gazette publication dates.

Standard name
Tariff Regulations
Primary topics
Transmission availability and outages

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (2)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document