Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft

Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2022"

Explanatory memorandum to a draftReleased with the notice dated 6 Sep 2022

Explanatory memorandum to the Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum for the draft Third Amendment (2022) to the CERC (Terms and Conditions of Tariff) Regulations, 2019. It explains why two changes are proposed to Appendix-II, 'Procedure for Calculation of Transmission System Availability Factor for a Month', and quotes the proposed wording of each.

The first part (p1–4) concerns Clause (4) and deemed availability. Ministry of Power letters of 31.08.2021, 16.06.2022 and 03.08.2022, and a MoP Office Memorandum of 3.08.2022, record that NHAI, Railways and BRO have been billed shutdown charges when transmission licensees shift ISTS lines, and that because of redundancy in the system transmission customers are generally unaffected. MoP decided that RPC Secretariats should issue deemed availability certificates for such shutdowns on nationally important infrastructure projects, that CEA should standardise shutdown periods and prepare a consolidated Standard Operating Procedure, and that CERC should amend its regulations. The memorandum therefore proposes a new sub-clause (iii) after sub-clause (ii) of Clause (4), with a proviso confining deemed availability to periods when DICs are unaffected; the Member Secretary, RPC may restrict the period to what is reasonable, and such shutdowns must be planned so as to be minimised (p3–4). Applications are to be considered irrespective of the date of application, but not for past shifting where the diversion work is already complete (p3).

The second part (p4–5) concerns Clause (5) and exclusion of outage periods. Excluding outages under sub-clauses (i) and (ii) presently has a dual effect on transmission charges — the beneficiary gets no benefit from the element while the liability remains — so the memorandum proposes deleting the provisos to sub-clause (ii) and adding a three-tier ladder: exclusion up to one month at the Member Secretary, RPC's discretion; beyond one month and up to three months by decision at the RPC; beyond three months only by the Commission, on an application giving reasons, mitigation steps and a restoration timeline (p4–5).

Standard name
Tariff Regulations
Primary topics
Transmission availability and outages, Transmission tariff

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document