Terms and Conditions of Tariff (Third Amendment) Regulations, 2023 — Statement of Reasons

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2023

Statement of reasonsDated 15 Dec 2023No.L-1/236/2018/CERC dated 15.12.2023

Replaced by Terms and Conditions of Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Terms and Conditions of Tariff Regulations, 2019 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's Statement of Reasons (SoR) for the CERC (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2023, issued on 15.12.2023 under file No. L-1/236/2018/CERC (p1). It records why the Commission amended Appendix-II of the 2019 Tariff Regulations — the "Procedure for Calculation of Transmission System Availability Factor for a Month" — and how it dealt with the comments it received on the draft amendment notified on 06.09.2022 (p1–2).

The trigger was Ministry of Power letters of 31.08.2021 and of 16-06-2022 and 03-08-2022 asking CERC to allow "deemed availability" when an ISTS line is shut down so that it can be shifted for infrastructure projects of NHAI, Railways and BRO, provided transmission customers are not affected (p1). Ten stakeholders commented, and a public hearing was held on 23.11.2022 (p2, p9).

Pages 2–5 deal with Clause (4) of Appendix-II. The Commission added a sub-clause allowing deemed availability for shutdowns to shift — and, after IndiGrid's comment, to modify — transmission lines for NHAI, Railways and BRO projects only, not for all infrastructure projects. It refused to extend deemed availability to cases where DICs are affected, agreed with KPTCL that the RPC must not certify deemed availability where the region's TTC/ATC is reduced, and required the Member Secretary to give the period and reasons along with the availability certificate. Where deemed availability is not allowed, the licensee may recover transmission charges and lost incentive from the project entity under their mutual arrangement (p4–5).

Pages 6–8 deal with Clause (5). The provisos to sub-clause (ii) are deleted, with reasons left to the Explanatory Memorandum, and a new sub-clause (iii) tiers who may exclude an outage period (p6). Requests for provisional outage treatment, a longer RPC window, or dropping CERC from the escalation ladder were rejected; RPCs were told they may frame a standard operating procedure (p6–8).

Standard name
Tariff Regulations
Primary topics
Transmission availability and outages, Transmission tariff

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document