Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2019 — Draft

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019

Draft regulationDated 14 Dec 2018No.L-1/236/2018/CERC dated 14th, December, 2018

Draft

A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019, issued on 14 December 2018 (p1). It is made under section 178 read with section 61 of the Electricity Act, 2003 and is intended to govern CERC's determination of tariff for generating stations and inter-State transmission systems under section 62 read with section 79 for the five-year period from 1 April 2019 to 31 March 2024 (p1–2). It states that it comes into force on 1.4.2019 and remains in force for five years unless reviewed earlier or extended (p1).

Chapter 1 (p1–23) sets the preliminary framework: short title and commencement, scope and exclusions, and a long list of definitions covering capital cost, COD, change in law, integrated mines, input price, prudence check, useful life and many technical terms. Chapter 2 (p24–28) deals with determination of commercial operation date and treatment of mismatches between the COD of a generating station and its associated transmission system, including who pays transmission charges during the gap. Chapter 3 (p29–39) lays down the procedure for tariff determination: who files, when, consolidated petitions, interim and final tariff, truing up for 2014–19 and 2019–24, and in-principle approval for additional capitalization on change-in-law or force majeure events.

Chapters 4 to 8 (p40–83) are the financial core. Chapter 4 sets the tariff structure — two-part tariffs for thermal and hydro, capacity charge and energy charge, and separate treatment of supplementary fixed cost for emission-control capex. Chapter 5 sets debt-equity principles. Chapter 6 specifies what is included in and excluded from capital cost, prudence check principles, IDC/IEDC, controllable and uncontrollable factors, and initial spares ceilings. Chapter 7 specifies the categories of additional capitalization within and beyond original scope, before and after cut-off, R&M, special allowance for coal/lignite thermal stations, a special provision for thermal stations completing 25 years, and additional capitalization for revised emission standards. Chapter 8 specifies the computation of annual fixed cost: return on equity, tax gross-up, interest on loan, depreciation, interest on working capital, and O&M expense norms for thermal, hydro, transmission and communication systems.

Chapters 9 and 10 (p84–95) introduce the integrated-mine framework: input price for coal or lignite from captive/basket mines, COD of mines, capital cost, additional capitalization, debt-equity, depreciation, O&M, working capital, return on equity, interest on loan and determination of input price. Chapter 10 specifies variable cost, landed cost of primary fuel, transit and handling losses, GCV computation and landed price of reagents.

Chapters 11 and 12 (p96–134) specify capacity and energy charge computation for thermal, hydro, pumped storage and transmission, including peak/off-peak capacity charge, incentives, energy charge formulae, pumped-storage pumping energy treatment and transmission availability factors. Chapter 12 sets the operational norms: normative quarterly plant availability and load factors, station heat rate, secondary fuel oil consumption, auxiliary energy consumption, hydro NAPAF and transmission NATAF.

Chapters 13 to 15 (p135–152) cover scheduling, metering, billing and payment, rebates and late payment surcharge, sharing of gains from controllable parameters, savings from re-financing, non-tariff income, CDM benefits and income from other business of transmission licensees. Chapter 15 has miscellaneous provisions including ceiling tariff, deferred tax, foreign exchange rate variation, application fees, special provisions for NLC India Ltd, Damodar Valley Corporation, BBMB and SSP, power to relax and power to remove difficulty. Appendices (p153–165) give the depreciation schedule, transmission availability calculation procedure, SIL table, availability formulae and a checklist for integrated-mine information.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document