CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2019 — Draft
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019
Draft regulationDated 14 Dec 2018No.L-1/236/2018/CERC dated 14th, December, 2018
Draft
A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft notification of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019, issued on 14 December 2018 (p1). It is made under section 178 read with section 61 of the Electricity Act, 2003 and is intended to govern CERC's determination of tariff for generating stations and inter-State transmission systems under section 62 read with section 79 for the five-year period from 1 April 2019 to 31 March 2024 (p1–2). It states that it comes into force on 1.4.2019 and remains in force for five years unless reviewed earlier or extended (p1).
Chapter 1 (p1–23) sets the preliminary framework: short title and commencement, scope and exclusions, and a long list of definitions covering capital cost, COD, change in law, integrated mines, input price, prudence check, useful life and many technical terms. Chapter 2 (p24–28) deals with determination of commercial operation date and treatment of mismatches between the COD of a generating station and its associated transmission system, including who pays transmission charges during the gap. Chapter 3 (p29–39) lays down the procedure for tariff determination: who files, when, consolidated petitions, interim and final tariff, truing up for 2014–19 and 2019–24, and in-principle approval for additional capitalization on change-in-law or force majeure events.
Chapters 4 to 8 (p40–83) are the financial core. Chapter 4 sets the tariff structure — two-part tariffs for thermal and hydro, capacity charge and energy charge, and separate treatment of supplementary fixed cost for emission-control capex. Chapter 5 sets debt-equity principles. Chapter 6 specifies what is included in and excluded from capital cost, prudence check principles, IDC/IEDC, controllable and uncontrollable factors, and initial spares ceilings. Chapter 7 specifies the categories of additional capitalization within and beyond original scope, before and after cut-off, R&M, special allowance for coal/lignite thermal stations, a special provision for thermal stations completing 25 years, and additional capitalization for revised emission standards. Chapter 8 specifies the computation of annual fixed cost: return on equity, tax gross-up, interest on loan, depreciation, interest on working capital, and O&M expense norms for thermal, hydro, transmission and communication systems.
Chapters 9 and 10 (p84–95) introduce the integrated-mine framework: input price for coal or lignite from captive/basket mines, COD of mines, capital cost, additional capitalization, debt-equity, depreciation, O&M, working capital, return on equity, interest on loan and determination of input price. Chapter 10 specifies variable cost, landed cost of primary fuel, transit and handling losses, GCV computation and landed price of reagents.
Chapters 11 and 12 (p96–134) specify capacity and energy charge computation for thermal, hydro, pumped storage and transmission, including peak/off-peak capacity charge, incentives, energy charge formulae, pumped-storage pumping energy treatment and transmission availability factors. Chapter 12 sets the operational norms: normative quarterly plant availability and load factors, station heat rate, secondary fuel oil consumption, auxiliary energy consumption, hydro NAPAF and transmission NATAF.
Chapters 13 to 15 (p135–152) cover scheduling, metering, billing and payment, rebates and late payment surcharge, sharing of gains from controllable parameters, savings from re-financing, non-tariff income, CDM benefits and income from other business of transmission licensees. Chapter 15 has miscellaneous provisions including ceiling tariff, deferred tax, foreign exchange rate variation, application fees, special provisions for NLC India Ltd, Damodar Valley Corporation, BBMB and SSP, power to relax and power to remove difficulty. Appendices (p153–165) give the depreciation schedule, transmission availability calculation procedure, SIL table, availability formulae and a checklist for integrated-mine information.
Read with this
The regulation
- Dated 7 Mar 2019Terms and Conditions of Tariff Regulations, 2019
Amendments and corrections
- Dated 15 Mar 2019Terms and Conditions of Tariff Regulations, 2019 — Corrigendum
- Dated 18 Sep 2019Terms and Conditions of Tariff Regulations, 2019 — Corrigendum
- Dated 25 Aug 2020Terms and Conditions of Tariff (First Amendment) Regulations, 2020
- Dated 19 Feb 2021Terms and Conditions of Tariff Regulations, 2019 — Second Amendment, 2021
- Dated 15 Dec 2023Terms and Conditions of Tariff Regulations, 2019 — Third Amendment, 2023
Commencement notices and reasons
- Dated 22 Mar 2019Terms and Conditions of Tariff Regulations, 2019 — Statement of Objects and Reasons
- Dated 2 Feb 2021Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Statement of Objects and Reasons
- Published in the Gazette 19 Feb 2021Terms and Conditions of Tariff (Second Amendment) Regulations, 2021 — Statement of Objects & Reasons
- Dated 15 Dec 2023Terms and Conditions of Tariff (Third Amendment) Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (3)
Proposed changes (drafts with no final yet)
- Dated 10 Sep 2023Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Draft
- Dated 10 Sep 2023Public notice: Draft Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Public Notice
- Released with the notice dated 10 Sep 2023Explanatory memorandum: Terms and Conditions of Tariff Regulations, 2019 — Fourth Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 5 Oct 2023Hearing notice: Public hearing notice on Draft Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023
Earlier drafts
- Dated 1 Apr 2020Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Draft
- Dated 20 Feb 2019Annexure or form: CEA Recommendations on Operation Norms for Thermal Generating Stations — DeSOx/DeNOx, Tariff Period 2019-24
- Released with the notice dated 1 Apr 2020Explanatory memorandum: Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Explanatory Memorandum
- Dated 1 Apr 2020Public notice: Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 1 Apr 2020Annexure or form: Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Appendix II: CEA Supporting Details on Part-Load Heat Rate and DeSOx/DeNOx Norms — Draft
- Dated 30 Apr 2020Notice extending the date for comments: Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Comment Deadline Extension Notice
- Dated 1 Jun 2020Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Draft
- Released with the notice dated 1 Jun 2020Annexure or form: Tariff Filing Forms (Integrated Mine) for Determination of Input Price — Part IV — Draft
- Dated 1 Jun 2020Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 1 Jun 2020Explanatory memorandum: Terms and Conditions of Tariff, 2019 — Second Amendment, 2020 — Explanatory Memorandum — Draft
- Dated 30 Jun 2020Notice extending the date for comments: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Comment Deadline Extension Public Notice
- Dated 15 Jul 2020Hearing notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — public hearing notice
- Dated 6 Sep 2022Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Draft
- Released with the notice dated 6 Sep 2022Explanatory memorandum: Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
- Dated 6 Sep 2022Public notice: Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Public Notice on Draft
- Dated 9 Nov 2022Hearing notice: Public hearing notice on Draft Terms and Conditions of Tariff (Third Amendment) Regulations, 2022
- Dated 14 Dec 2018Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Dated 7 Jan 2019Notice extending the date for comments: Draft Terms and Conditions of Tariff Regulations, 2019 — Public Notice Extending Comments Deadline and Public Hearing, January 2019
8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.