CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff (First Amendment) Regulations, 2020

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020

Amendment · Gazette copyDated 25 Aug 2020Published in the Gazette 3 Feb 2021No. L-1/236/2018/CERC dated 25th August, 2020

Replaced by Terms and Conditions of Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Terms and Conditions of Tariff (First Amendment) Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the gazette printing of CERC's First Amendment, dated 25 August 2020, to the CERC (Terms and Conditions of Tariff) Regulations, 2019 (p12). It is published as Gazette of India Extraordinary, Part III Section 4, No. 53, and its single purpose is to open a cost-recovery channel for emission control systems — flue-gas desulphurisation and de-NOx equipment — retrofitted into coal and lignite based thermal generating stations.

The amendment first inserts definitions of auxiliary energy consumption for the emission control system, its date of operation (ODe) and the emission control system itself, and repairs the Plant Load Factor definition to account for the extra auxiliary consumption (p12–13). It then threads the concept through the tariff machinery: capital cost and additional capitalisation (p13–14), supplementary tariff filing within a fixed window from ODe (p13), supplementary capacity charges built on the Annual Fixed Cost of the emission control system (p14), depreciation schedules keyed to the vintage of the station (p15), return on equity and interest on loan for the emission-control asset (p14–15), working capital and O&M norms including sale of gypsum or other by-products (p15–16).

A new Regulation 42A sets out how the supplementary capacity charge is computed, shared among beneficiaries and split between High Demand and Low Demand seasons and between peak and off-peak hours, with rules on off-setting under- and over-recovery (pp17–20). Regulation 43 gains a supplementary energy charge covering differential energy charges from auxiliary consumption and reagent cost (p20). Regulation 49 gains normative auxiliary consumption and reagent consumption norms per emission-control technology (pp21–22), and Annexure I gains FORM 16A for reporting reagent data (pp22–23).

Standard name
Tariff Regulations
Primary topics
Emission control costs, Tariff determination, Generation tariff

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (2)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document