CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff (First Amendment) Regulations, 2020
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020
AmendmentDated 25 Aug 2020No. L-1/236/2018/CERC dated 25th August, 2020
Replaced by Terms and Conditions of Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Terms and Conditions of Tariff Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020 amend the CERC Tariff Regulations, 2019 to build a cost-recovery framework for emission control systems installed at coal- and lignite-based thermal generating stations to meet revised emission standards. The notification is dated 25 August 2020 and commences on Gazette publication; no Gazette date is printed. Clause (6) of Regulation 21 is expressly applied from 1 April 2019 (p1). The principal regulations were gazetted on 3 May 2019 (p24).
Clause 2 inserts definitions for auxiliary energy consumption for emission control ('AUXe'), date of operation of an emission control system ('ODe') and emission control system, and recasts the plant load factor definition so that auxiliary consumption for emission control is counted (p2–3). Clauses 3–14 amend the capital-cost and tariff-determination provisions: they allow emission control systems into capital cost, require a supplementary tariff application after ODe, treat emission-control expenditure as additional capitalisation, recast the supplementary capacity charge as part of supplementary tariff and provide for its recovery (p3–6). The same block sets specific return on equity, interest on loan, depreciation and working capital treatments for emission control systems, including un-discharged liabilities and initial spares (p6–9).
Clauses 15–16 deal with working capital and O&M: they add emission-control items to working capital norms, require reference to MoEFCC water-consumption norms and prescribe O&M expenses for emission control systems, escalated over the tariff period ending 31 March 2024, net of income from gypsum or other by-products (p9–10).
Clauses 17–23 align the chapter and regulation titles for energy charges and introduce 'supplementary energy charge' into the payment and computation framework (p10–20). Regulation 42 is amended to incorporate emission-control auxiliary consumption into the plant availability factor formula, and a new Regulation 42A creates the computation and payment mechanism for supplementary capacity charges, including beneficiary sharing, high-demand and low-demand seasons and peak/off-peak treatment with asymmetric offset rules (p11–18). Clause 23 adds supplementary energy charge and a supplementary ECR formula covering differential auxiliary consumption and reagent cost (p18–20).
Clauses 24–25 insert supplementary charges into the payment regulation and set normative auxiliary energy consumption for FGD and NOx-control technologies, with a proviso for gas-to-gas heaters, and normative specific reagent consumption for wet limestone FGD, lime spray dryer, dry sorbent injection, CFBC, sea-water FGD, SNCR and SCR (p20–23).
Clause 26 corrects Form 15 and inserts a new Form 16A for monthly reagent details in Annexure I (p23–25).
Read with this
The regulation
- Dated 7 Mar 2019Terms and Conditions of Tariff Regulations, 2019
Amendments and corrections
- Dated 15 Mar 2019Terms and Conditions of Tariff Regulations, 2019 — Corrigendum
- Dated 18 Sep 2019Terms and Conditions of Tariff Regulations, 2019 — Corrigendum
- Dated 19 Feb 2021Terms and Conditions of Tariff Regulations, 2019 — Second Amendment, 2021
- Dated 15 Dec 2023Terms and Conditions of Tariff Regulations, 2019 — Third Amendment, 2023
Commencement notices and reasons
- Dated 22 Mar 2019Terms and Conditions of Tariff Regulations, 2019 — Statement of Objects and Reasons
- Dated 2 Feb 2021Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Statement of Objects and Reasons
- Published in the Gazette 19 Feb 2021Terms and Conditions of Tariff (Second Amendment) Regulations, 2021 — Statement of Objects & Reasons
- Dated 15 Dec 2023Terms and Conditions of Tariff (Third Amendment) Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (3)
Proposed changes (drafts with no final yet)
- Dated 10 Sep 2023Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Draft
- Dated 10 Sep 2023Public notice: Draft Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Public Notice
- Released with the notice dated 10 Sep 2023Explanatory memorandum: Terms and Conditions of Tariff Regulations, 2019 — Fourth Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 5 Oct 2023Hearing notice: Public hearing notice on Draft Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023
Earlier drafts
- Dated 14 Dec 2018Terms and Conditions of Tariff Regulations, 2019 — Draft
- Dated 14 Dec 2018Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Dated 7 Jan 2019Notice extending the date for comments: Draft Terms and Conditions of Tariff Regulations, 2019 — Public Notice Extending Comments Deadline and Public Hearing, January 2019
- Dated 1 Apr 2020Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Draft
- Dated 20 Feb 2019Annexure or form: CEA Recommendations on Operation Norms for Thermal Generating Stations — DeSOx/DeNOx, Tariff Period 2019-24
- Released with the notice dated 1 Apr 2020Explanatory memorandum: Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Explanatory Memorandum
- Dated 1 Apr 2020Public notice: Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 1 Apr 2020Annexure or form: Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Appendix II: CEA Supporting Details on Part-Load Heat Rate and DeSOx/DeNOx Norms — Draft
- Dated 30 Apr 2020Notice extending the date for comments: Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Comment Deadline Extension Notice
- Dated 1 Jun 2020Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Draft
- Released with the notice dated 1 Jun 2020Annexure or form: Tariff Filing Forms (Integrated Mine) for Determination of Input Price — Part IV — Draft
- Dated 1 Jun 2020Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 1 Jun 2020Explanatory memorandum: Terms and Conditions of Tariff, 2019 — Second Amendment, 2020 — Explanatory Memorandum — Draft
- Dated 30 Jun 2020Notice extending the date for comments: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Comment Deadline Extension Public Notice
- Dated 15 Jul 2020Hearing notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — public hearing notice
- Dated 6 Sep 2022Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Draft
- Released with the notice dated 6 Sep 2022Explanatory memorandum: Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
- Dated 6 Sep 2022Public notice: Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Public Notice on Draft
- Dated 9 Nov 2022Hearing notice: Public hearing notice on Draft Terms and Conditions of Tariff (Third Amendment) Regulations, 2022
8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.