Terms and Conditions of Tariff (First Amendment) Regulations, 2020

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020

AmendmentDated 25 Aug 2020No. L-1/236/2018/CERC dated 25th August, 2020

Replaced by Terms and Conditions of Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Terms and Conditions of Tariff Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020 amend the CERC Tariff Regulations, 2019 to build a cost-recovery framework for emission control systems installed at coal- and lignite-based thermal generating stations to meet revised emission standards. The notification is dated 25 August 2020 and commences on Gazette publication; no Gazette date is printed. Clause (6) of Regulation 21 is expressly applied from 1 April 2019 (p1). The principal regulations were gazetted on 3 May 2019 (p24).

Clause 2 inserts definitions for auxiliary energy consumption for emission control ('AUXe'), date of operation of an emission control system ('ODe') and emission control system, and recasts the plant load factor definition so that auxiliary consumption for emission control is counted (p2–3). Clauses 3–14 amend the capital-cost and tariff-determination provisions: they allow emission control systems into capital cost, require a supplementary tariff application after ODe, treat emission-control expenditure as additional capitalisation, recast the supplementary capacity charge as part of supplementary tariff and provide for its recovery (p3–6). The same block sets specific return on equity, interest on loan, depreciation and working capital treatments for emission control systems, including un-discharged liabilities and initial spares (p6–9).

Clauses 15–16 deal with working capital and O&M: they add emission-control items to working capital norms, require reference to MoEFCC water-consumption norms and prescribe O&M expenses for emission control systems, escalated over the tariff period ending 31 March 2024, net of income from gypsum or other by-products (p9–10).

Clauses 17–23 align the chapter and regulation titles for energy charges and introduce 'supplementary energy charge' into the payment and computation framework (p10–20). Regulation 42 is amended to incorporate emission-control auxiliary consumption into the plant availability factor formula, and a new Regulation 42A creates the computation and payment mechanism for supplementary capacity charges, including beneficiary sharing, high-demand and low-demand seasons and peak/off-peak treatment with asymmetric offset rules (p11–18). Clause 23 adds supplementary energy charge and a supplementary ECR formula covering differential auxiliary consumption and reagent cost (p18–20).

Clauses 24–25 insert supplementary charges into the payment regulation and set normative auxiliary energy consumption for FGD and NOx-control technologies, with a proviso for gas-to-gas heaters, and normative specific reagent consumption for wet limestone FGD, lime spray dryer, dry sorbent injection, CFBC, sea-water FGD, SNCR and SCR (p20–23).

Clause 26 corrects Form 15 and inserts a new Form 16A for monthly reagent details in Annexure I (p23–25).

Standard name
Tariff Regulations
Primary topics
Emission control costs, Tariff determination, Capital cost and investment

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document