Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Statement of Objects and Reasons

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020 - Statement of Objects & Reasons thereof.

Statement of reasonsDated 2 Feb 2021No. L-1/236/2018/CERC dated 2nd February, 2021

Replaced by Terms and Conditions of Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Terms and Conditions of Tariff Regulations, 2019 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is CERC's Statement of Objects and Reasons for the CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020, issued on 2 February 2021 (p1). It explains why the Commission amended the 2019 Tariff Regulations to create a supplementary tariff framework for emission control systems at coal/lignite thermal generating stations (p1–2). The 2019 regulations had already provided in-principle approval for emission-control capex but left financial, operational and recovery parameters for separate specification (p1–2).

The introduction recounts the consultation: CEA recommendations on operational norms in 2019, CEA backup calculations, the draft amendment and public notice on 1 April 2020, extension of comments to 15 May 2020, public hearing on 13 July 2020, and notification of the final amendment on 25 August 2020 (p2–3). Scope is then defined: the supplementary tariff applies only where emission-control expenditure is additional capital expenditure, not part of the original project cost, with transition exceptions for stations commissioned on or after 1 April 2019 (p4–5).

The rest walks through the amendments chapter by chapter. Chapter 1 defines auxiliary energy consumption of emission control systems, date of operation, emission control system, plant availability factor and plant load factor (p5–7). Chapter 3 sets the application route for supplementary tariff, interim tariff and availability certification (p7–8). Chapter 4 brings supplementary tariff and supplementary capacity charges into the tariff structure (p8), while Chapter 5 retains a 70:30 debt-equity ratio for emission control systems (p8–9). Chapter 6 covers IDC/IEDC pro-rata treatment and initial spares (p9–10); Chapter 7 covers additional capitalization including undischarged liability (p10). Chapter 8 is the longest and sets return on equity, interest on loan, depreciation recovery scenarios, working capital and O&M expenses for emission control systems (p10–15). Chapters 10 to 12 deal with supplementary energy charges, reagent landed cost, supplementary capacity and energy charge computation, and operational norms for auxiliary energy consumption and reagent consumption, with review once sufficient data is available (p15–21). Annexure I modifies Form 15 and adds Form 16A for reagent consumption (p21).

Standard name
Tariff Regulations
Primary topics
Emission control costs, Tariff determination, Generation tariff

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document