Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020 - Statement of Objects & Reasons thereof.
Statement of reasonsDated 2 Feb 2021No. L-1/236/2018/CERC dated 2nd February, 2021
Replaced by Terms and Conditions of Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Terms and Conditions of Tariff Regulations, 2019 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This document is CERC's Statement of Objects and Reasons for the CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020, issued on 2 February 2021 (p1). It explains why the Commission amended the 2019 Tariff Regulations to create a supplementary tariff framework for emission control systems at coal/lignite thermal generating stations (p1–2). The 2019 regulations had already provided in-principle approval for emission-control capex but left financial, operational and recovery parameters for separate specification (p1–2).
The introduction recounts the consultation: CEA recommendations on operational norms in 2019, CEA backup calculations, the draft amendment and public notice on 1 April 2020, extension of comments to 15 May 2020, public hearing on 13 July 2020, and notification of the final amendment on 25 August 2020 (p2–3). Scope is then defined: the supplementary tariff applies only where emission-control expenditure is additional capital expenditure, not part of the original project cost, with transition exceptions for stations commissioned on or after 1 April 2019 (p4–5).
The rest walks through the amendments chapter by chapter. Chapter 1 defines auxiliary energy consumption of emission control systems, date of operation, emission control system, plant availability factor and plant load factor (p5–7). Chapter 3 sets the application route for supplementary tariff, interim tariff and availability certification (p7–8). Chapter 4 brings supplementary tariff and supplementary capacity charges into the tariff structure (p8), while Chapter 5 retains a 70:30 debt-equity ratio for emission control systems (p8–9). Chapter 6 covers IDC/IEDC pro-rata treatment and initial spares (p9–10); Chapter 7 covers additional capitalization including undischarged liability (p10). Chapter 8 is the longest and sets return on equity, interest on loan, depreciation recovery scenarios, working capital and O&M expenses for emission control systems (p10–15). Chapters 10 to 12 deal with supplementary energy charges, reagent landed cost, supplementary capacity and energy charge computation, and operational norms for auxiliary energy consumption and reagent consumption, with review once sufficient data is available (p15–21). Annexure I modifies Form 15 and adds Form 16A for reagent consumption (p21).
Read with this
The regulation
- Dated 7 Mar 2019Terms and Conditions of Tariff Regulations, 2019
Amendments and corrections
- Dated 15 Mar 2019Terms and Conditions of Tariff Regulations, 2019 — Corrigendum
- Dated 18 Sep 2019Terms and Conditions of Tariff Regulations, 2019 — Corrigendum
- Dated 25 Aug 2020Terms and Conditions of Tariff (First Amendment) Regulations, 2020
- Dated 19 Feb 2021Terms and Conditions of Tariff Regulations, 2019 — Second Amendment, 2021
- Dated 15 Dec 2023Terms and Conditions of Tariff Regulations, 2019 — Third Amendment, 2023
Commencement notices and reasons
- Dated 22 Mar 2019Terms and Conditions of Tariff Regulations, 2019 — Statement of Objects and Reasons
- Published in the Gazette 19 Feb 2021Terms and Conditions of Tariff (Second Amendment) Regulations, 2021 — Statement of Objects & Reasons
- Dated 15 Dec 2023Terms and Conditions of Tariff (Third Amendment) Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (3)
Proposed changes (drafts with no final yet)
- Dated 10 Sep 2023Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Draft
- Dated 10 Sep 2023Public notice: Draft Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Public Notice
- Released with the notice dated 10 Sep 2023Explanatory memorandum: Terms and Conditions of Tariff Regulations, 2019 — Fourth Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 5 Oct 2023Hearing notice: Public hearing notice on Draft Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023
Earlier drafts
- Dated 14 Dec 2018Terms and Conditions of Tariff Regulations, 2019 — Draft
- Dated 14 Dec 2018Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Dated 7 Jan 2019Notice extending the date for comments: Draft Terms and Conditions of Tariff Regulations, 2019 — Public Notice Extending Comments Deadline and Public Hearing, January 2019
- Dated 1 Apr 2020Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Draft
- Dated 20 Feb 2019Annexure or form: CEA Recommendations on Operation Norms for Thermal Generating Stations — DeSOx/DeNOx, Tariff Period 2019-24
- Released with the notice dated 1 Apr 2020Explanatory memorandum: Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Explanatory Memorandum
- Dated 1 Apr 2020Public notice: Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 1 Apr 2020Annexure or form: Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Appendix II: CEA Supporting Details on Part-Load Heat Rate and DeSOx/DeNOx Norms — Draft
- Dated 30 Apr 2020Notice extending the date for comments: Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Comment Deadline Extension Notice
- Dated 1 Jun 2020Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Draft
- Released with the notice dated 1 Jun 2020Annexure or form: Tariff Filing Forms (Integrated Mine) for Determination of Input Price — Part IV — Draft
- Dated 1 Jun 2020Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 1 Jun 2020Explanatory memorandum: Terms and Conditions of Tariff, 2019 — Second Amendment, 2020 — Explanatory Memorandum — Draft
- Dated 30 Jun 2020Notice extending the date for comments: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Comment Deadline Extension Public Notice
- Dated 15 Jul 2020Hearing notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — public hearing notice
- Dated 6 Sep 2022Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Draft
- Released with the notice dated 6 Sep 2022Explanatory memorandum: Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
- Dated 6 Sep 2022Public notice: Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Public Notice on Draft
- Dated 9 Nov 2022Hearing notice: Public hearing notice on Draft Terms and Conditions of Tariff (Third Amendment) Regulations, 2022
8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.