CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2019 — Statement of Objects and Reasons

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 applicable from 1.4.2019 - Statement of Objects & Reasons (SOR) thereof.

Statement of reasonsDated 22 Mar 2019No.L-1/236/2018/CERC dated 22nd March, 2019

Replaced by Terms and Conditions of Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Terms and Conditions of Tariff Regulations, 2019 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 31 of 41. Check the regulator's original before you rely on it.

The CERC's Statement of Objects and Reasons (SOR) for the CERC (Terms and Conditions of Tariff) Regulations, 2019 was issued on 22 March 2019 (p1) and is the Commission's own account of why the final 2019-24 tariff regulations differ from the draft published on 14.12.2018. Section 1 sets out the statutory basis under the Electricity Act 2003 and the consultation chronology — a data request to generating companies and transmission licensees, a staff consultation paper, the Central Advisory Committee, CEA recommendations, the draft and its public notice, 85 stakeholder submissions, and a public hearing on 1 February 2019 — and records that the Regulations were notified on 7.3.2019 and corrected by a corrigendum on 15.3.2019 (p1–4).

Section 2 narrows the scope: two chapters proposed in the draft — input price of coal and lignite from integrated mines, and operational norms for the revised emission standards — have been pulled out to be notified separately (p4–5).

The rest walks chapter by chapter through the final regulations and explains each change: definitions (Chapter 1, p5–8); date of commercial operation and treatment of mismatch (Chapter 2, p8–10); tariff petition procedure and filing deadlines (Chapter 3, p10–12); tariff structure, energy charges and the optional post-useful-life tariff (Chapter 4, p12–15); the debt-equity decision for assets that have completed useful life (Chapter 5, p15–16); capital cost inclusions and exclusions, prudence check and initial spares (Chapter 6, p16–19); heads of additional capitalisation (Chapter 7, p19–20); and annual fixed cost — return on equity with a ramping incentive/disincentive deferred to 1.4.2020, retained depreciation limits, working-capital coal stock, O&M expense norms and the WPI/CPI escalation build-up (Chapter 8, p20–27).

It then covers the deferred integrated-mine chapter and the fallback for coal pricing (p27–28), the components of energy charge including transit and handling losses (p28–29), and the differential peak/off-peak capacity charge mechanism for thermal stations, which also starts 1.4.2020 (p29–31).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.