Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Explanatory Memorandum

Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff)(First Amendment) Regulations, 2020"

Explanatory memorandum to a draftReleased with the notice dated 1 Apr 2020

Draft

The draft has since been finalised as the Terms and Conditions of Tariff (First Amendment) Regulations, 2020.

Explanatory memorandum to the Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's explanatory memorandum for the draft CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020. It explains why CERC proposes to amend its 2019 Tariff Regulations to create a separate tariff stream for emission control systems that coal- or lignite-based thermal generating stations must install to meet the MoEFCC's revised emission standards (p1–4).

The background (p1–3) records that the 2019 Principal Regulations already provided for supplementary tariff and in-principle approval for emission control capex, but left O&M expenses, operational norms and reagent consumption to be notified separately. It cites CEA recommendations of 20.2.2019 and 25.6.2019 as the basis for the proposed norms. Pages 3–4 summarise the technologies in scope: ESP retrofits or replacement, FGD, low-NOx burners, SNCR/SCR, mercury controls and water-consumption measures.

The proposed amendments (p4–12) would add definitions for auxiliary energy consumption, date of operation and emission control system, and amend plant load factor (p5–6); expand tariff determination and application provisions (p6); and adapt financial parameters — debt-equity, IDC/IEDC, initial spares, additional capitalisation, return on equity, interest on loan, depreciation and working capital, including reagent stock — to emission control assets (p6–8). They would allow O&M expenses as a percentage of admitted capital expenditure until data is available, and link water expenses to the revised standards (p8–9).

The core tariff changes are a new Regulation 42A for supplementary capacity charges, recovered like the peak/off-peak framework effective 1 April 2020, and a formula in Regulation 43 for supplementary energy charges covering reagent landed cost and incremental auxiliary consumption (p10). New or amended norms for auxiliary energy consumption and reagent consumption are proposed on CEA recommendations, with limestone purity to be factored into the formula rather than assumed (p11–12). Annexure I Form 15 is modified and Form 16A added for reagent consumption (p12). The proposed amendments are to take effect from 1 June 2020, except the Regulation 21 amendment from 1 April 2019 (p5).

Standard name
Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Capital cost and investment

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document