CERC · Central Electricity Regulatory Commission
Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Explanatory Memorandum
Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff)(First Amendment) Regulations, 2020"
Explanatory memorandum to a draftReleased with the notice dated 1 Apr 2020
Draft
The draft has since been finalised as the Terms and Conditions of Tariff (First Amendment) Regulations, 2020.
Explanatory memorandum to the Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission's explanatory memorandum for the draft CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020. It explains why CERC proposes to amend its 2019 Tariff Regulations to create a separate tariff stream for emission control systems that coal- or lignite-based thermal generating stations must install to meet the MoEFCC's revised emission standards (p1–4).
The background (p1–3) records that the 2019 Principal Regulations already provided for supplementary tariff and in-principle approval for emission control capex, but left O&M expenses, operational norms and reagent consumption to be notified separately. It cites CEA recommendations of 20.2.2019 and 25.6.2019 as the basis for the proposed norms. Pages 3–4 summarise the technologies in scope: ESP retrofits or replacement, FGD, low-NOx burners, SNCR/SCR, mercury controls and water-consumption measures.
The proposed amendments (p4–12) would add definitions for auxiliary energy consumption, date of operation and emission control system, and amend plant load factor (p5–6); expand tariff determination and application provisions (p6); and adapt financial parameters — debt-equity, IDC/IEDC, initial spares, additional capitalisation, return on equity, interest on loan, depreciation and working capital, including reagent stock — to emission control assets (p6–8). They would allow O&M expenses as a percentage of admitted capital expenditure until data is available, and link water expenses to the revised standards (p8–9).
The core tariff changes are a new Regulation 42A for supplementary capacity charges, recovered like the peak/off-peak framework effective 1 April 2020, and a formula in Regulation 43 for supplementary energy charges covering reagent landed cost and incremental auxiliary consumption (p10). New or amended norms for auxiliary energy consumption and reagent consumption are proposed on CEA recommendations, with limestone purity to be factored into the formula rather than assumed (p11–12). Annexure I Form 15 is modified and Form 16A added for reagent consumption (p12). The proposed amendments are to take effect from 1 June 2020, except the Regulation 21 amendment from 1 April 2019 (p5).
Read with this
The regulation
- Dated 7 Mar 2019Terms and Conditions of Tariff Regulations, 2019
Amendments and corrections
- Dated 15 Mar 2019Terms and Conditions of Tariff Regulations, 2019 — Corrigendum
- Dated 18 Sep 2019Terms and Conditions of Tariff Regulations, 2019 — Corrigendum
- Dated 25 Aug 2020Terms and Conditions of Tariff (First Amendment) Regulations, 2020
- Dated 19 Feb 2021Terms and Conditions of Tariff Regulations, 2019 — Second Amendment, 2021
- Dated 15 Dec 2023Terms and Conditions of Tariff Regulations, 2019 — Third Amendment, 2023
Commencement notices and reasons
- Dated 22 Mar 2019Terms and Conditions of Tariff Regulations, 2019 — Statement of Objects and Reasons
- Dated 2 Feb 2021Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Statement of Objects and Reasons
- Published in the Gazette 19 Feb 2021Terms and Conditions of Tariff (Second Amendment) Regulations, 2021 — Statement of Objects & Reasons
- Dated 15 Dec 2023Terms and Conditions of Tariff (Third Amendment) Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (3)
Proposed changes (drafts with no final yet)
- Dated 10 Sep 2023Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Draft
- Dated 10 Sep 2023Public notice: Draft Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Public Notice
- Released with the notice dated 10 Sep 2023Explanatory memorandum: Terms and Conditions of Tariff Regulations, 2019 — Fourth Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 5 Oct 2023Hearing notice: Public hearing notice on Draft Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023
Earlier drafts
- Dated 14 Dec 2018Terms and Conditions of Tariff Regulations, 2019 — Draft
- Dated 14 Dec 2018Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Dated 7 Jan 2019Notice extending the date for comments: Draft Terms and Conditions of Tariff Regulations, 2019 — Public Notice Extending Comments Deadline and Public Hearing, January 2019
- Dated 1 Apr 2020Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Draft
- Dated 20 Feb 2019Annexure or form: CEA Recommendations on Operation Norms for Thermal Generating Stations — DeSOx/DeNOx, Tariff Period 2019-24
- Dated 1 Apr 2020Public notice: Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 1 Apr 2020Annexure or form: Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Appendix II: CEA Supporting Details on Part-Load Heat Rate and DeSOx/DeNOx Norms — Draft
- Dated 30 Apr 2020Notice extending the date for comments: Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Comment Deadline Extension Notice
- Dated 1 Jun 2020Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Draft
- Released with the notice dated 1 Jun 2020Annexure or form: Tariff Filing Forms (Integrated Mine) for Determination of Input Price — Part IV — Draft
- Dated 1 Jun 2020Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 1 Jun 2020Explanatory memorandum: Terms and Conditions of Tariff, 2019 — Second Amendment, 2020 — Explanatory Memorandum — Draft
- Dated 30 Jun 2020Notice extending the date for comments: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Comment Deadline Extension Public Notice
- Dated 15 Jul 2020Hearing notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — public hearing notice
- Dated 6 Sep 2022Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Draft
- Released with the notice dated 6 Sep 2022Explanatory memorandum: Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
- Dated 6 Sep 2022Public notice: Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Public Notice on Draft
- Dated 9 Nov 2022Hearing notice: Public hearing notice on Draft Terms and Conditions of Tariff (Third Amendment) Regulations, 2022
8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.