Skip to content

CERC · Central Electricity Regulatory Commission

Tariff Filing Forms (Integrated Mine) for Determination of Input Price, Part IV

TARIFF FILING FORMS (INTEGRATED MINE) FOR DETERMINATION OF INPUT PRICE Main Tariff Form PART-IV

OrderDate not stated

Replaced by Terms and Conditions of Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Terms and Conditions of Tariff Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is Annexure-I, Part IV of CERC's tariff filing forms, a template pack for a generating company seeking determination of input price from an integrated coal/lignite mine (p1). Pages 2–4 are checklists: main tariff forms, supporting forms, and documents/certificates to be attached; a note requires e-filing in Word/Excel plus pen drive (p4). Forms 1, 1A and 1B (pp5–8) build up input price from ROM cost, additional charges for crushing/transportation/handling/washing and statutory charges. Forms 2, 2A and 2B (pp9–11) collect claimed capital cost, return on equity and O&M, with O&M expressed as a formula over average capital cost and escalated annually. Forms 3 and 3A (pp12–13) capture mine-plan characteristics and normative parameters for input-price computation. Forms 4 and 4A (pp14–16) cover foreign loans and equity, including drawl, hedging, exchange rates and taxes. Pages 17–18 give the admitted capital cost abstract and financial package. Forms 7 and 8 (pp19–22) allocate mine-specific and corporate loans to the integrated mine. Pages 23–29 and 31–32 cover additional capitalisation, depreciation, weighted average interest, drawdown for IDC/financing charges and equity drawl. Forms 15–18 (pp33–37) cover non-tariff income, statutory charges, mine closure expenses and GCV adjustment. Supporting forms B to N (pp38–57) collect capital cost break-ups, packages, de-capitalisation, reconciliation, CWIP, interest on normative loan and working capital, incidental expenditure, actual cash expenditure and liability flow. The forms are filing templates for CERC tariff/input-price proceedings, not a statement of the tariff norms themselves.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Fuel price and supply, Capital cost and investment

Read with this

The regulation

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document