Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Draft

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2022

Draft amendmentDated 6 Sep 2022No.L-1/236/2018/CERC dated 06.09. 2022

Draft

A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2019 — Third Amendment, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page draft notification dated 06.09.2022 (p1) in which CERC proposes the Third Amendment to its 2019 Tariff Regulations. It is a draft for previous publication: the text says it will come into force from the date it is notified in the official Gazette (p1), and that Gazette date is not printed. Only Appendix-II of the Principal Regulations — the procedure for calculating the monthly Transmission System Availability Factor — is touched; transmission tariff principles themselves are not.

Clause 2 (p1) adds a new sub-clause (iii) to Clause (4) of Appendix-II. It creates a deemed-availability concession where a transmission line is shut down so it can be shifted for projects of NHAI, Railways and the Border Road Organisation. The Member Secretary, RPC may limit the deemed availability period to what he considers reasonable for the work involved, and the concession applies only for periods in which DICs are not affected by the shutdown.

Clause 3 (p2) deals with Clause (5) of Appendix-II. It deletes the existing provisos to sub-clause (ii) and adds a new sub-clause (iii) setting a three-tier ladder for declaring an outage period excludable: the Member Secretary, RPC for the shortest durations, the RPC for the middle band, and the Commission for the longest, where the transmission licensee must apply with reasons, mitigation steps taken and a restoration timeline.

The closing Note (p2) records the Gazette particulars of the Principal Regulations and of the First and Second Amendments, giving the lineage of the instrument this draft would amend.

Standard name
Tariff Regulations
Primary topics
Transmission availability and outages

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document