Skip to content

CERC · Central Electricity Regulatory Commission

Tariff Filing Forms (Integrated Mine) for Determination of Input Price — Part IV — Draft

TARIFF FILING FORMS (INTEGRATED MINE) FOR DETERMINATION OF INPUT PRICE Main Tariff Form PART-IV

Annexure or form of a draftReleased with the notice dated 1 Jun 2020

Annexure or form of the Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is Part IV (Annexure-I) of the tariff filing forms for an integrated mine, used by a generating company to present the input price of coal/lignite from a mine before CERC (p1). It is a forms-and-checklist document rather than a substantive tariff order: it tells a petitioner which forms and supporting papers to file, and provides the blank tables in which the claimed cost components are to be set out (pp2–4).

The opening checklist lists the main forms and supporting forms (pp2–3), then a separate list requires company and mine incorporation/commencement documents, audited mine-wise and corporate accounts, loan agreements, capital-cost approvals, equity agreements, end-use plant details, cost audit reports and reconciliations (p4). A note requires electronic filing and pen-drive submissions (p4).

The main forms then collect: summary input price, ROM cost, additional charges for crushing/transportation/handling/washing, capital cost, return on equity, O&M, mine characteristics, normative parameters, foreign loans/equity, financial package, mine-specific and corporate loan allocation, additional capitalisation, depreciation, weighted average interest, IDC/financing charges, non-tariff income, statutory charges, mine closure expenses and GCV adjustment (pp5–37). They distinguish existing and new mines, departmental and agency activities, and generating-company versus MDO mine-closure responsibility (pp7–8, pp35–36).

The supporting forms continue with capital-cost estimates, package break-ups, de-capitalisation, reconciliation to books, exclusions, capital cost and CWIP statements, normative-loan and working-capital interest, incidental expenditure, actual cash expenditure and liability flow (pp38–56). Appendix-I gives the asset-wise depreciation schedule for integrated mines, including useful lives and salvage-value exceptions (p57). Throughout, the notes require audited or certified data, true-up submissions, justification for capitalisation or de-capitalisation, and foreign-exchange/hedging details (e.g. pp6, 20, 23, 42, 45).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Fuel price and supply, Capital cost and investment

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document