Terms and Conditions of Tariff, 2019 — Second Amendment, 2020 — Explanatory Memorandum — Draft

Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff)(Second Amendment) Regulations, 2020"

Explanatory memorandum to a draftReleased with the notice dated 1 Jun 2020

Explanatory memorandum to the Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's explanatory memorandum for the draft CERC (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2020. It is a rationale and clause-by-clause guide to proposed changes in the 2019 Principal Tariff Regulations, not the amending regulation itself (p1). Its subject is coal and lignite from integrated mines allocated to generating companies whose tariffs CERC determines under Section 62 (p1–2).

The background explains that the Principal Regulations deferred a framework for input price of coal or lignite from integrated mines. Until now, coal was billed at Coal India Ltd notified prices and lignite under Ministry of Coal guidelines; the Ministry of Coal discontinued lignite price determination by letter dated 24.6.2019. CERC set up a working group chaired by the WBERC Chairperson, and this memorandum follows its recommendations (p1–2). The amendments are proposed to replace provisional billing and to apply retrospectively from 1 April 2019, except Regulation 6 and Regulation 59, which apply from notification (p3).

The memorandum then walks through each proposed amendment. Regulation 3 is expanded with definitions for integrated mines — annual target quantity, capital cost, COD, commencement of production, escrow account, loading point, mine infrastructure, mining plan, peak rated capacity, input price, O&M expenses and useful life (p3–6). Regulation 4 adds interpretations for tonne and year (p6). Regulation 5 provides a COD framework for an integrated mine, including deferment where the generating company is prevented from declaring COD for reasons beyond its control (p7). A new Regulation 7A values coal or lignite supplied before COD and adjusts revenue from such supply against capital cost (p7–8). Regulations 9 and 10 set the procedure and timelines for filing and deciding input-price petitions, with an option to file separately or with the generating station tariff (p8–9). Regulation 11 requires prior information to beneficiaries and in-principle approval for additional capital expenditure above a threshold (p9). Regulation 13 provides for truing up on actuals (p9–10). Regulation 16 adjusts energy charges for landed fuel cost from an integrated mine (p10).

The core of the memorandum is the new Regulation 36A–36R framework (p11–24). It specifies the components of input price (ROM cost, additional charges and statutory charges); separate ROM cost methods for auctioned coal mines, allotted coal mines and lignite mines; additional charges for transportation, washery, crushing and handling; capital cost and additional capital expenditure; annual extraction cost; capital structure, return on equity and interest on loan; depreciation; O&M expenses; interest on working capital; mine closure expenses; computation and recovery of input price; and adjustments for overburden-removal shortfall, GCV shortfall and non-tariff income, supported by a Credit Adjustment Note and third-party quality measurement (p11–24). It also sets a beneficiary-consent test for energy charges from integrated-mine coal and a no-higher-energy-charge direction from the Ministry of Power (p22). Regulation 59 clarifies priority of late payment surcharge, and Regulation 71 extends the NLC India Ltd exception to its integrated mine (p25).

Standard name
Tariff Regulations
Primary topics
Fuel price and supply, Capital cost and investment, Return, financing and working capital

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.