CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Draft

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020

Draft amendmentDated 1 Apr 2020No.L-1/236/2018/CERC dated 1st April, 2020

Draft

A proposal that has since been finalised as the Terms and Conditions of Tariff (First Amendment) Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft CERC notification dated 1 April 2020 proposing the First Amendment to the CERC (Terms and Conditions of Tariff) Regulations, 2019 (p1). Its single subject is how coal- and lignite-based thermal generating stations recover the cost of emission control systems — the equipment retrofitted to meet revised emission standards (p2).

It defines auxiliary energy consumption for the emission control system (AUXe), the date of operation of the system (ODe) and the emission control system itself, and rewrites the plant load factor definition and the plant availability factor formula so that emission-control auxiliary consumption is grossed back (p2-3, p10). Generating companies must file for supplementary tariff within 60 days of the system's date of operation (p4).

The amendment then threads emission-control expenditure through capital cost, additional capitalisation, un-discharged liability, interest on loan, return on equity and depreciation, and adds working-capital and O&M norms for the system (pp3-9, 17). The O&M norm is a percentage of admitted capital expenditure escalated annually to the tariff period ending 31 March 2024, with income from gypsum or other by-products netted off (p8).

Clause 22 inserts a new Regulation 42A: supplementary capacity charge computed annually on the annual fixed cost of the emission control system, recovered monthly, shared among beneficiaries in proportion to their capacity allocation, and split into high-demand and low-demand seasons and peak and off-peak hours, with asymmetric rules for offsetting under- and over-recovery (pp10-16). Clause 23 adds a supplementary energy charge rate driven by specific reagent consumption and landed reagent price (pp16-17).

Clause 25 sets technology-wise normative auxiliary consumption for flue gas desulphurisation and NOx control and reagent consumption formulae for wet limestone, lime spray dryer, dry sorbent injection, CFBC and sea-water FGD, plus urea and ammonia norms for SNCR and SCR (pp18-21). Clause 26 corrects Form 15 and inserts Form 16A for reagent details (pp21-23).

Commencement is 1 June 2020 or such other date as the Commission may notify, except the Regulation 21 amendment, which takes effect from 1 April 2019 (p1).

Standard name
Tariff Regulations
Primary topics
Emission control costs, Tariff determination, Generation tariff

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (3)

Earlier drafts

8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document