GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Third Amendment) Regulations, 2021
Draft amendmentDated 29 Jun 2021DRAFT NOTIFICATION NO. ___ OF 2021 dated 29/06/2021
Draft
A proposal that has since been finalised as the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the draft third amendment to GERC's 2016 net metering regulations for grid-connected rooftop solar, signed at Gandhinagar on 29 June 2021 and issued for consultation (p1, p18). It substantially recasts the parent framework rather than tweaking it: a new definition set introduces "gross meter", "gross metering" and "prosumer", and widens "eligible consumer" to third-party sale (p1–2).
Regulations 3 to 5 — scope, general principles and capacity targets — are extended to gross metering arrangements, prosumers and solar plants set up by third parties, with Regulation 3.2(b) extended beyond residential premises (p2–3). Regulation 6 is retitled to include prosumers, and eligibility is broadened to tenants and lessees and to any individual, company or body of persons setting up solar power systems for captive use, sale to the licensee, or third-party sale, including under REC or RPO routes (p4–5). Regulation 6.2 fixes the split between net metering for loads up to 10 kW and gross metering above 10 kW, with installed capacity between 1 kW and 1 MW and capacity allowances differentiated for residential, captive, REC and RPO projects (p5–6).
The largest part is the fully substituted Regulation 9 (p6–16), which lays out energy accounting and settlement by category — residential and government consumers, captive use, third-party sale, REC mechanism and RPO compliance — covering set-off windows, how surplus injection and excess drawl are priced, banking charges, and how the licensee must show injected, supplied, net-billed and net-exported energy separately. Regulation 9(d) preserves the regime in force when a project was commissioned, but requires a fresh agreement on any change in capacity or load.
Clause 12 amends Regulation 12 so captive use joins the transmission-charge and loss exemption, and adds Regulations 12.2 (wheeling and transmission) and 12.3 (cross-subsidy and additional surcharge) (p16–17). New Regulation 13.7 allows non-ABT meters for consumers whose contracted load does not exceed 1 MW, and new Regulation 16.1 treats replacement or enhancement of solar modules without approval as an 'unauthorised capacity addition' attracting penalty, with a 30-day deemed approval if the licensee does not decide (p17–18).
Annexure-I adds 'SPS – Solar Power System' to the abbreviations (p19), and pp20–35 reproduce the model net/gross metering interconnection agreement, covering eligibility, technical and interconnection requirements, clearances and approvals, access and disconnection, liabilities, metering, commercial settlement by consumer category, connection costs, records, dispute resolution and termination.
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.