Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft

Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Third Amendment) Regulations, 2021

Draft amendmentDated 29 Jun 2021DRAFT NOTIFICATION NO. ___ OF 2021 dated 29/06/2021

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft third amendment to GERC's 2016 net metering regulations for grid-connected rooftop solar, signed at Gandhinagar on 29 June 2021 and issued for consultation (p1, p18). It substantially recasts the parent framework rather than tweaking it: a new definition set introduces "gross meter", "gross metering" and "prosumer", and widens "eligible consumer" to third-party sale (p1–2).

Regulations 3 to 5 — scope, general principles and capacity targets — are extended to gross metering arrangements, prosumers and solar plants set up by third parties, with Regulation 3.2(b) extended beyond residential premises (p2–3). Regulation 6 is retitled to include prosumers, and eligibility is broadened to tenants and lessees and to any individual, company or body of persons setting up solar power systems for captive use, sale to the licensee, or third-party sale, including under REC or RPO routes (p4–5). Regulation 6.2 fixes the split between net metering for loads up to 10 kW and gross metering above 10 kW, with installed capacity between 1 kW and 1 MW and capacity allowances differentiated for residential, captive, REC and RPO projects (p5–6).

The largest part is the fully substituted Regulation 9 (p6–16), which lays out energy accounting and settlement by category — residential and government consumers, captive use, third-party sale, REC mechanism and RPO compliance — covering set-off windows, how surplus injection and excess drawl are priced, banking charges, and how the licensee must show injected, supplied, net-billed and net-exported energy separately. Regulation 9(d) preserves the regime in force when a project was commissioned, but requires a fresh agreement on any change in capacity or load.

Clause 12 amends Regulation 12 so captive use joins the transmission-charge and loss exemption, and adds Regulations 12.2 (wheeling and transmission) and 12.3 (cross-subsidy and additional surcharge) (p16–17). New Regulation 13.7 allows non-ABT meters for consumers whose contracted load does not exceed 1 MW, and new Regulation 16.1 treats replacement or enhancement of solar modules without approval as an 'unauthorised capacity addition' attracting penalty, with a 30-day deemed approval if the licensee does not decide (p17–18).

Annexure-I adds 'SPS – Solar Power System' to the abbreviations (p19), and pp20–35 reproduce the model net/gross metering interconnection agreement, covering eligibility, technical and interconnection requirements, clearances and approvals, access and disconnection, liabilities, metering, commercial settlement by consumer category, connection costs, records, dispute resolution and termination.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Energy accounting and settlement

Read with this

Proposed changes (drafts with no final yet)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document