GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
EXPLANATORY MEMORANDUM
Explanatory memorandum to a draftDated 18 May 2024
Draft
The draft has since been finalised as the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024.
Explanatory memorandum to the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Gujarat Electricity Regulatory Commission's Explanatory Memorandum sets out why and how it proposes to amend its 2016 Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, and reproduces the draft text of each change. It is a reasons document, not the amending regulation itself.
The opening pages (p1–3) give the trigger: the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 (notified 31.12.2020) and the Amendment Rules, 2024 (notified 22.02.2024), together with a MoP letter of 18.01.2021 asking State Commissions to align their regulations. It quotes the amended rule 11 sub-rules 7, 7A, 8, 9 and 9A on technical feasibility, deemed acceptance, infrastructure strengthening and connection agreements, and identifies Regulations 5.1, 7 and Annexure-IV as the provisions needing change.
The memorandum then takes three existing provisions in turn. Item 1 (p3–7) proposes substituting Regulation 5.1 on capacity targets: system strengthening costs up to a threshold capacity go into the distribution licensee's Annual Revenue Requirement, with per-kW and per-kVA recovery above that threshold split by consumer category and by whether the discom is state-owned or private. Item 2 (p7–17) proposes substituting Regulation 7's procedure table, setting activity-wise timelines for registration, electrical inspection approval, technical feasibility, connectivity, system strengthening, metering and commissioning, with a deemed-acceptance proviso for small applications. Item 3 (p18) proposes substituting clause 8.1 of the Connectivity Agreement in Annexure-IV so that cost recovery follows Regulation 5.1.
Each item closes with a rationale tying the change back to the Amendment Rules, 2024. The document does not state when the amendments take effect, nor does it carry a date of its own.
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.