GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Second Amendment) Regulations, 2020
AmendmentDated 23 Jan 2020Notification No. 2 of 2020 dated 23/01/2020
Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Second Amendment to the GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations, 2016 (the Principal Regulations), issued as Notification No. 2 of 2020 and signed 23/01/2020 (p14). It extends to the whole of Gujarat and takes effect from the date of publication in the Official Gazette, which is not printed in the text (p1).
It inserts a new definition of MSME (Manufacturing) Enterprise into Regulation 2.1, tying eligibility to registration under the MSMED Act, 2006 and reproducing the investment-in-plant-and-machinery thresholds (p2), and amends Regulation 5 to cap the cumulative rooftop capacity at a distribution transformer to the transformer's own capacity (p3).
Regulation 6.2 is amended to set the eligible system size: 50% of sanctioned load/contract demand for most consumers, with no such limit for residential consumers and MSME (Manufacturing) Enterprises (p3–4). References to GEDA are broadened to "GEDA or agency designated by the Government of Gujarat", and the protection-system sub-activity is rewritten to require anti-islanding and a second line of protection for systems above 10 kW (p4).
Regulation 9 on Energy Accounting and Settlement is wholly replaced (pp4–9). It creates separate settlement sub-regimes by consumer class and by whether the consumer uses the 'energy attribute', the 'renewable attribute' for RPO, or REGs — residential/government, industrial/commercial other than MSME, MSME (Manufacturing), RPO-compliance consumers, and REC consumers. It fixes surpluses rates, banking within one billing cycle, 15-minute time-block accounting for certain categories, and year-end crediting (pp4–9).
Metering (Regulation 13.5) is replaced with accuracy classes, mandatory check meters above 20 kW, and cost/testing responsibilities (pp9–10); the two net metering configuration diagrams are deleted (p10). Annexure IV clauses 7(A)(ii), 7(B)(a)(ii), new 7(B)(a)(iii), 7(B)(b)(ii), 7(B)(c)(ii) and 1.3 are amended to align interconnection agreements with the new settlement and capacity rules (pp10–14).
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.