GERC · Gujarat Electricity Regulatory Commission
Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2020 — Statement of Reasons
Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Second Amendment) Regulations, 2020.
Statement of reasonsDated 23 Jan 2020
Replaced by Grid Interactive Distributed Renewable Energy Sources Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's Statement of Reasons for the second amendment to its 2016 Net Metering Rooftop Solar PV Grid Interactive Systems Regulations. It is not the regulation text: it records the drafting history, stakeholder comments and the Commission's reasoning provision by provision, and states that the amendments "shall come into force with effect from the date of their publication in the Official Gazette" (p11) — that Gazette date is not printed. The signed instrument is dated 23.01.2020 (p12).
Background (p1–2) sets out the principal regulations (Notification No. 5 of 2016, 18.06.2016), the 2017 first amendment, three petitions that prompted a review, the draft notification of 18.12.2019 and the public hearing of 16.01.2020.
The substantive sections take each amended provision in turn. A new MSME (Manufacturing) definition is inserted in Regulation 2.1 by reference to the MSMED Act, 2006 (p2–3), and requests to allow third-party owned or RESCO-model systems are refused (p3). The 65% ceiling on cumulative rooftop capacity per distribution transformer is removed, leaving the licensee to design the transformer (p3–4). The 50% of sanctioned load/contract demand limit is retained generally, but MSME (Manufacturing) enterprises may exceed it subject to 15-minute settlement, while residential and MSME consumers may install to suit self-consumption, with network strengthening at the consumer's cost where overloading occurs (p4–5). Registration or coordination agencies designated by the Government are added alongside GEDA in Regulation 7 (p5).
The largest section (p5–8) replaces procurement of surplus energy at APPC with a fixed surplus injection compensation rate differentiated by consumer class — Rs. 2.25 per kWh for residential and government consumers, Rs. 1.75 per kWh for other non-REC consumers and Rs. 1.50 per kWh for REC projects — justified by falling solar costs, GUVNL's competitively bid solar tariff and the SURYA Scheme. Billing-cycle settlement is retained except for MSME installations above 50%, where 15-minute time blocks apply, and credit balances are paid at financial-year end and only above Rs. 100 (p6, p8–9).
Later sections reword the main solar meter accuracy class to remove inconsistency with Annexure VI (p9), delete two net metering configuration diagrams (p9), align Annexure IV clause 7 with Regulation 11 so the whole rooftop generation counts toward the licensee's RPO where the consumer does not use renewable attributes (p10–11), clarify Annexure IV clause 1.3 and add the Chief Electrical Inspector's second-line protection requirement (p11–12). GUVNL's plea for retrospective application is declined (p11). Annexure I lists the commenting stakeholders (p13).
Read with this
The regulation
Amendments and corrections
- Dated 6 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems (First Amendment) Regulations, 2017
- Dated 23 Jan 2020Net Metering Rooftop Solar PV Grid Interactive Systems (Second Amendment) Regulations, 2020
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2022
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024
- Dated 3 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 5 Oct 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Statement of Reasons
- Dated 31 May 2022Net Metering Rooftop Solar PV Grid Interactive Systems (Third Amendment) Regulations, 2022 — Statement of Reasons
- Dated 4 Sep 2024Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 4 Nov 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Jan 2016Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Draft
- Dated 13 Jun 2017Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — First Amendment, 2017 — Draft
- Dated 18 Dec 2019Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Second Amendment, 2019 — Draft
- Dated 29 Jun 2021Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Third Amendment, 2021 — Draft
- Dated 18 May 2024Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fourth Amendment, 2024 — Draft
- Dated 18 May 2024Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Amendment — Explanatory Memorandum
- Dated 14 Oct 2025Net Metering Rooftop Solar PV Grid Interactive Systems Regulations, 2016 — Fifth Amendment, 2025 — Draft
- Dated 14 Oct 2025Explanatory memorandum: Net Metering Rooftop Solar PV Grid Interactive Systems, 2016 — Fifth Amendment, 2025 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.